Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
A PRE-CONSTRUCTION MEETING WAS CONDUCTED WITH GARY BROWN OWNER OF THE A-ATLAS FOR THIS SITE. MOST ALL THE STORM WATER CONTROLS ARE IN EXCEPT APPROXIMATELY 100' OF SILT-FENCING LOCATED IN THE SE CORNER OF THE PROJECT. INSTALLATION OF THE SILT-FENCING WILL BE COMPLETED BY THE END OF THE WEEK. WILL RE-INSPECT LATE FRIDAY THE 13TH TO ENSURE POSTING REQUIREMENTS HAVE BEEN MET AND SILT-FENCING HAS BEEN COMPLETED. |
| 03/23/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Not ready for Inspection |
No activity at this site at this time. |
| 02/25/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Not ready for Inspection |
I MET WITH RUSSELL SHAW WHO WORKS FOR SIERRA LAND SURVEYING AND DEVELOPMENT SERVICES. HE EXPLAINED THAT HE WILL BEGIN GRADING WITHIN THE NEXT MONTH. I EXPLAINED HE WILL NEED TO CALL IN FOR A PRE-CONSTRUCTION MEETING BEFORE THEY BEGIN TO GRADE. |