Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU02737
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2006 | GRADING - FINAL | Approved | Contractor completed punch list and stabilized area. | |
02/15/2006 | GRADING - FINAL | Partial Approval | Completed punch list. 1- Complete all grading. 2- Install all parking lot striping. 3- Install all H.C. parking. 4- Backfill all open holes and trenches. 5- Stabilize all areas distrubed by construction activity. 6- Remove or seperate all construction activity and materials from public access. 7- Supply letter from engineer in regards to drainage ways. 8- Install tow down on concrete header. (spillway to basin) |