Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU02737
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2006 | STORMWATER FOLLOW-UP INSP | Approved | Contractor stabilized all areas. | |
03/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor hydroseeded around perimeter of project. | |
03/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contacted Jeff site super in regards to stabilizing area around pool. Jeff said should be taken care of by Wed. 3/29/06. He is going to contact the landscaper and confirm and let me know. | |
02/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor continues final grading. | |
01/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep stormwater controls in working order around cath basin north side of project. | |
01/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor started to remove stockpiles and starting to grade site. | |
12/22/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed items found on last inspection. | |
12/19/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor given CORRECTION NOTICE. Contractor given 14 days to: 1- Complete general maintenance of the stormwater controls. Around perimeter of site. 2- Keep track-out cleaned off street. (36th. St.) 3- Schedule a stormwater follow up inspection after items are completed. Non-compliance could result in a Stop Work Order or the issue of a citation for violation of Stormwater Ordinance. |
|
12/06/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep up with general maintenance. | |
11/15/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor given copy of stormwater ordinance. Contractor needs to address general maintenance of stormwater controls. Item noted on 10-17-05 has not been repaired. Contractor asked me to come back out on Friday 11-18-05 for a reinspection. |
|
11/02/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to perform general maintenance to stromwater controls. Item noted on last inspection has not beed addressed. Talked to Jeff site super. |
|
10/17/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Talked to Jeff site super in regards to silt fencing. (5' hole on the westside) Jeff also told me they would be installing truncated dome on H.C. ramps and all down spouts will be piped under sidewalk. |
|
09/15/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor made repairs to silt fence noted on last visit. Contractor needs to keep up with general maintence of silt fence. | |
09/08/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor has made some improvements to stormwater controls. Contractor still needs to to repair fence a long far westside of site. jeff said he would have repairs by Monday 9-12-05. Contractor to call in re-inspection. |
|
09/07/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to make repairs to silt fence in various location around site. 3rd. Notice. |
|
08/22/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to replace or repair silt fence in various locations. This is the second notice. Inspection request given to site super. | |
08/01/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- Make repairs to silt fence in various locations. 2- Control track-out. |