Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04BU02737

Parcel: 12907006S


Addresses:

1563 E 36TH ST


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02737

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
04/20/2006 STORMWATER FOLLOW-UP INSP Approved Contractor stabilized all areas.
03/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor hydroseeded around perimeter of project.
03/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contacted Jeff site super in regards to stabilizing area around pool. Jeff said should be taken care of by Wed. 3/29/06. He is going to contact the landscaper and confirm and let me know.
02/08/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor continues final grading.
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to keep stormwater controls in working order around cath basin north side of project.
01/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor started to remove stockpiles and starting to grade site.
12/22/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor addressed items found on last inspection.
12/19/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor given CORRECTION NOTICE.
Contractor given 14 days to:
1- Complete general maintenance of the stormwater controls. Around perimeter of site.
2- Keep track-out cleaned off street. (36th. St.)
3- Schedule a stormwater follow up inspection after items are completed.
Non-compliance could result in a Stop Work Order or the issue of a citation for violation of Stormwater Ordinance.
12/06/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to keep up with general maintenance.
11/15/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor given copy of stormwater ordinance.
Contractor needs to address general maintenance of stormwater controls. Item noted on 10-17-05 has not been repaired.
Contractor asked me to come back out on Friday 11-18-05 for a reinspection.
11/02/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to perform general maintenance to stromwater controls. Item noted on last inspection has not beed addressed.
Talked to Jeff site super.
10/17/2005 STORMWATER FOLLOW-UP INSP Partial Approval Talked to Jeff site super in regards to silt fencing. (5' hole on the westside)
Jeff also told me they would be installing truncated dome on H.C. ramps and all down spouts will be piped under sidewalk.
09/15/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor made repairs to silt fence noted on last visit. Contractor needs to keep up with general maintence of silt fence.
09/08/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor has made some improvements to stormwater controls.
Contractor still needs to to repair fence a long far westside of site. jeff said he would have repairs by Monday 9-12-05. Contractor to call in re-inspection.
09/07/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to make repairs to silt fence in various location around site.
3rd. Notice.
08/22/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to replace or repair silt fence in various locations. This is the second notice. Inspection request given to site super.
08/01/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to address:
1- Make repairs to silt fence in various locations.
2- Control track-out.