Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 07/08/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) SWEEP PUBLIC ROADWAY OF ANY MATERIAL TRACKED OFF SITE. 2) PRIOR TO FINAL GRADING APPROVAL, A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD IS REQUIRED STATING THAT THE BASIN ON SITE WAS BUILT PER PLAN AND PERFORMS IN ACCORDANCE WITH PRESCRIBED STANDARDS. 3) PRIOR TO ENGINEERING APPROVAL FOR A C OF O, A FINAL GRADING INSPECTION (#09190) MUST BE ACCOMPLISHED AND APPROVED. 4) IF YOU HAVE ANY QUESTIONS, MIKE RUSSO 240-9859 |