Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 05/04/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | THIS SITE IS MOVING ALONG A STEADY PACE. THE STORM WATER CONTROLS REMAIN OPERATIONAL FOR ANY RAIN EVENT THAT MAY OCCUR. SITE WORK HAS BEGUN WITH THE RAISING OF THE CONCRETE WALLS. A VERY LARGE CRANE HAS BEEN BROUGHT ON-SITE AND CONSTRUCTED TO MOVE/LIFT THE HEAVY CONCRETE SLABS FOR WALLS. NO OTHER CONCERS AT THIS TIME. | |
| 04/12/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Site remains within compliance. No other storm water concerns at this time. | |
| 04/07/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL REQUESTED CORRECTIONS REGARDING CONCRETE WASH-OUT, REMOVAL OF 50-GALLON BARRELS FOR CONCRETE SEALER, REMOVAL OF STOCK-PILE AND REMOVAL OF DIRT IN THE STREET HAVE BEEN TAKEN CARE OF. NO OTHER STORM WATER CONTROLS AT THIS TIME. | |
| 04/04/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Corrections required: 1) Providea concrete wash-out area and femove existing concrete contamination and dispose accordingly. 2) Remove dirt in street along curb. 3) Provide secondary spill containment for open containers. 4) Provide silt-fencing for trench spoils near the entrance. Re-inspection scheduled for Thursday April 7th. |
|
| 03/30/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Chuck the superintendent has a few corrections and some additional work to be in compliance with the approved SWPPP plan. A re-inspection will occur on April 1st. | |
| 03/16/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | THIS SITE WAS IN NEED OF SEVERAL CORRECTIONS REGARDING STABILIZED ENTRANCE, REMOVAL OF DIRT ON THE STREET, KNOCK DOWN HEIGHT OF STOCK-PILE, PROVIDE A CONCRETE WASH-OUT. WILL RE-INSPECT ON FRIDAY THE 18TH. |