Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU02490
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/11/2006 | STORMWATER FOLLOW-UP INSP | Approved | ||
10/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. WOLF 548-7348 |
|
08/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SEDIMENT FROM ROCK RIP RAP AT INLET TO C.O.T. STORM DRAINAGE SYSTEM AT THE SOUTHWEST CORNER OF THE SITE. 2. PROVIDE INLET PROTECTION/SWPPP CONTROLS AT THE CATCH BASIN NEAR THE SOUTHEAST CORNER OF THE SITE. 3. SWEEP THE SEDIMENT IN PANTANO ROAD. WOLF: 548-7348 |
|
08/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SEDIMENT FROM ROCK AT INLET TO C.O.T. STORMDRAIN SYSTEM AT SOUTHWEST CORNER OF SITE. 2. PROVIDE INLET PROTECTION SWPPP CONTROLS AT CATCH BASIN NEAR SOUTHEAST CORNER OF SITE. 3. SWEEP SEDIMENT IN PANTANO ROAD. |
|
07/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CLEAN UP AND REMOVE ALL SEDIMENT IN THE DRAINAGEWAY ON THE SOUTHWEST CORNER OF THE SITE AND PROVIDE SWPPP CONTROLS. 2. PROVIDE INLET SWPPP CONTROL AT CATCH BASIN INLET AT SOUTHEAST CORNER OF THE SITE. 3. PROVIDE TEMPORARY SWALE AT WEST PERIMETER UNTIL AREA IS STABILIZED. |
|
06/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE GRADING IS IN PROGRESS PROVIDE (1) STABILIZED CONSTRUCTION ENTRANCE A THE NORTH SIDE OF THE PROJECT. |
|
05/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CLEAN UP AND CONTAIN ALL CONSTRUCTION MATERIAL AND DEBRIS 2. REMOVE SMALL DIRT PILES LOCATED OUTSIDE STORMWATER CONTROLS AT THE SW CORNER OF THE SITE. |
|
04/28/2006 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
04/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
04/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MAINTAIN SEDIMENT AND EROSION CONTROLS AT SOUTHWEST CORNER AND WEST PERIMETER. | |
01/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
12/28/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
12/01/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
11/15/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE (2) STABILIZED CONSTRUCTION ENTRANCES, 1-3" ROCK, 6" THICK, 30' X 50' (SEE BMP 39) 2. REPAIR OR REPLACE SILT FENCE ON THE WEST PERIMETER, AND THE NORTHWEST AND SOUTHWEST CORNERS OF SITE. 3. STORE ALL LIQUID MATERIALS IN APPROVED STORAGE CONTAINMENT. 4. PREPARE WEEKLY INSPECTION REPORT. 5. UPDATE THE SWPPP TO SHOW CURRENT CONDITIONS. |