Permit: T04BU02490


Addresses:

370 N PANTANO RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02490

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
12/11/2006 STORMWATER FOLLOW-UP INSP Approved
10/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
WOLF 548-7348
08/22/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. REMOVE SEDIMENT FROM ROCK RIP RAP AT INLET TO C.O.T. STORM DRAINAGE SYSTEM AT THE SOUTHWEST CORNER OF THE SITE.
2. PROVIDE INLET PROTECTION/SWPPP CONTROLS AT THE CATCH BASIN NEAR THE SOUTHEAST CORNER OF THE SITE.
3. SWEEP THE SEDIMENT IN PANTANO ROAD.

WOLF: 548-7348
08/22/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. REMOVE SEDIMENT FROM ROCK AT INLET TO C.O.T. STORMDRAIN SYSTEM AT SOUTHWEST CORNER OF SITE.
2. PROVIDE INLET PROTECTION SWPPP CONTROLS AT CATCH BASIN NEAR SOUTHEAST CORNER OF SITE.
3. SWEEP SEDIMENT IN PANTANO ROAD.
07/26/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CLEAN UP AND REMOVE ALL SEDIMENT IN THE DRAINAGEWAY ON THE SOUTHWEST CORNER OF THE SITE AND PROVIDE SWPPP CONTROLS.
2. PROVIDE INLET SWPPP CONTROL AT CATCH BASIN INLET AT SOUTHEAST CORNER OF THE SITE.
3. PROVIDE TEMPORARY SWALE AT WEST PERIMETER UNTIL AREA IS STABILIZED.
06/06/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE GRADING IS IN PROGRESS
PROVIDE (1) STABILIZED CONSTRUCTION ENTRANCE A THE NORTH SIDE OF THE PROJECT.
05/19/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CLEAN UP AND CONTAIN ALL CONSTRUCTION MATERIAL AND DEBRIS
2. REMOVE SMALL DIRT PILES LOCATED OUTSIDE STORMWATER CONTROLS AT THE SW CORNER OF THE SITE.
04/28/2006 STORMWATER FOLLOW-UP INSP Cancelled
04/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
04/19/2006 STORMWATER FOLLOW-UP INSP Correction Required MAINTAIN SEDIMENT AND EROSION CONTROLS AT SOUTHWEST CORNER AND WEST PERIMETER.
01/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
12/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
12/01/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
11/15/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. PROVIDE (2) STABILIZED CONSTRUCTION ENTRANCES, 1-3" ROCK, 6" THICK, 30' X 50' (SEE BMP 39)
2. REPAIR OR REPLACE SILT FENCE ON THE WEST PERIMETER, AND THE NORTHWEST AND SOUTHWEST CORNERS OF SITE.
3. STORE ALL LIQUID MATERIALS IN APPROVED STORAGE CONTAINMENT.
4. PREPARE WEEKLY INSPECTION REPORT.
5. UPDATE THE SWPPP TO SHOW CURRENT CONDITIONS.