Permit: T04BU02317


Addresses:

7250 E VOYAGER RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02317

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
01/26/2010 STORMWATER FOLLOW-UP INSP Approved
01/27/2009 STORMWATER FOLLOW-UP INSP Partial Approval 3 ACTIVE LOTS
NO CONCERNS AT THIS TIME
10/03/2008 STORMWATER FOLLOW-UP INSP Correction Required SWEEP AT ACTIVE LOTS
09/02/2008 STORMWATER FOLLOW-UP INSP Correction Required SWEEP STREETS TRACK OUT
08/13/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-SWEEP AT ALL ACTIVE LOTS (PER PAULA TO BE CP 8/16)
07/15/2008 STORMWATER FOLLOW-UP INSP Partial Approval TALKED TO PAULA REGARDING ISSUES ON SITE

SHE ADVISED CLEAN UP WORK CP AND READY FOR RE-INSPECT
07/10/2008 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTION NOTICE 5 DAYS
-TRACK OUT AT ACTIVE LOTS
-UNCONTAINED CONSTRUCTION DEBRIS
-NO CURBSIDE BMPS IN PLACE
05/08/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
03/17/2008 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT AT 7181 AND 7187 BLOOMTREE
03/06/2008 STORMWATER FOLLOW-UP INSP Partial Approval RICHMOND AM NOW BUILDING IN THIS VILLAGE
NO CONCERNS AT THIS TIME
11/09/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
10/01/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
09/13/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
07/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
06/27/2007 STORMWATER FOLLOW-UP INSP Correction Required DROPPED OFF PAPERWORK
06/26/2007 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTION NOTICE 10 DAYS
SWEEP AT LOTS 1027/1028
CLEAN OUT DRAINAGEWAY BETWEEN LOTS 1024/1023
05/17/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
04/24/2007 STORMWATER FOLLOW-UP INSP Partial Approval memo to Lennar:

DATE: April 24, 2007

TO: Drew Neptune
Area Environmental Manger, Lennar
Chuck Blair
Division Environmental Manager, Lennar
FROM: Nichole Kalahar Zormeier
Environmental Inspector
Development Services Department

SUBJECT: Sycamore Park Villages 1, 2, 4, 6 and 7

This memo is a follow up to our on-site meeting Friday April 20, 2007.

Sycamore Park Villages 1, 2, 4, 6, and 7 (Grading Permit Numbers: T04BU02317, T04BU02319, T04BU02321, T04BU02323, T04BU02324) under management by Lennar have been inspected by me during the timeframe October 2005 to current.

In this timeframe there have been correction notices issued for different stormwater and grading issues. These correction notices have all been addressed in a timely manner. There is no further action pending for any of the past correction notices.

I thank you in advance for your continued responsiveness and proactive approach to maintaining compliance with all AZPDES and City of Tucson requirements for stormwater and grading.


Sincerely,


Nichole Kalahar Zormeier
Environmental Inspector
Development Services Department
City of Tucson
04/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH DREW AND CHUCK
DISCUSSED SWPPP CONCERNS AND CORRECTION NOTICE DOCUMENTATION
03/21/2007 STORMWATER FOLLOW-UP INSP Partial Approval TRACK OUT AT CONCRETE WASHOUT AREA USED FOR VLG 1 AND VLG 2
NO OTHER CONCERNS AT THIS TIME
01/31/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-HEAVY TRACK OUT FROM TRADES LOTS 44-49 AND 57-63
-CLEAN SEDIMENT AND DEBRIS FROM DRAINAGEWAYS BETWEEN LOTS 15/16 AND 23/24
01/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval HAND DELIVERED PPW
01/09/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-SWEEP BEECHNUT AND CHERRYWOOD
-REMOVE DIRT RAMP FROM ROADWAY LOT 16
11/27/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-LOT 24 CONCRETE WASHOUT AND UNCONTAINED CONSTRUCTION DEBRIS
-CATCH BASIN W OF LOT 44 FULL OF SEDIMENT CONTROLS (CURBSIDE BMP) ALL ACTIVE LOTS CHERRYWOOD
-SWEEP CHERRYWOOD AND BEECHNUT
11/16/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-CLEAN UP CONCRETE WASHOUT LOT 24
-PROTECT STOCKPILE LOT 61 AND 47
-CURBSIDE BMP NEEDS TO BE RE-ESTABLISHED LOT 19
-PLACE STUCCO (MORTAR) MIXER BMP LOT 14
-PLACE SEDIMENT CONTROLS LOTS 64-66
10/17/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-SWEEP WOODLAKE, BLOOMTREE, ALDERBERRY
-LOT 32 UNPROTECTED STOCKPILE AND TRACK OUT
-LOT 37 DIRT IN ROADWAY
-LOT 23/22 DIRT IN ROADWAY (NO CONTROLS)
-ESTABLISH/RE-ESTABLISH CURBSIDE BMPS LOTS 21-12, 11, 64-67
-CONCRETE WASHOUT LOT 64
-LOT 6 STUCCO MIXER NOT USING BMP
09/08/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-1039 AND 1038 BLOOMTREE LN CURBSIDE BMPS NEEDED-TRACK OUT
-SWEEP CHERRYWOOD (TRACK OUT)
-SWEEP CEDARBROOK
-TRACK OUT ON ALDERBERRY 1071 WEST
-PLACE CURBSIDE BMPS AT ALL ACTIVE LOTS (STOCK PILES)
-CONTROLS NO WORKING/MISSING IN CATCH BASIN WEST END OF ALDERBERRY ST
08/09/2006 STORMWATER FOLLOW-UP INSP Correction Required -PLACE S.C.E. LOT EAST OF MODELS (STOCKPILED MATERIALS)
-SWEEP TRACK OUT BLOOMTREE
-SWEEP ALDERBERRY
07/13/2006 STORMWATER FOLLOW-UP INSP Correction Required STUCCO WASHED OUT AT LOTS 104 AND 1003
06/20/2006 STORMWATER FOLLOW-UP INSP Correction Required -MOVE SEDIMENT CONTROLS ALONG WEST SIDE OF PROJECT IN FRONT OF WALL OPENINGS
-ENSURE SEDIMENT CONTROLS IN DROP INLET AT BEECHNUT AND ALDERBERRY WILL WORK AS PROSCRIBED
04/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval CONCRETE WASH OUT IN PLACE
SOME TRACKING ON ASPHALT
LENNAR HAS SALES OFFICE AND CONSTRUCTION OFFICES IN PLACE
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK CONTINUES
02/28/2006 STORMWATER FOLLOW-UP INSP Approved SOME PAVING HAS BEEN COMPLETED (WEST SIDE OF PROJECT)
NO SWPPP IN PLACE AT SOUTH END OF KOLB PLACED YET
02/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/09/2006 STORMWATER FOLLOW-UP INSP Correction Required SEDIMENT CONTROLS NEED TO BE IN PLACE AT THE SOUTH SIDE (END OF) KOLB RD
12/19/2005 STORMWATER FOLLOW-UP INSP Partial Approval VERTICAL CURB FOR SYCAMORE PARK BLVD INSTALLED
ROUGH GRADE FOR RET BASIN CP
11/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME
ALL SWPPP IN PLACE AND APPEAR TO BE WORKING
MET WITH DAN MATTAUSCH 730-9447
SWPPP POSTING AT WEST SCE
DAN WILL CHECK ON SECONDARY CONTAINMENT FOR FORM RELEASE BEING USED ON BOX CULVERT OVER THE PANTANO WASH
06/27/2005 STORMWATER FOLLOW-UP INSP Partial Approval Site has begun to develope final grading elevations for home pads within phase 1. Site has a v-ditch constructed in front of the silt-fence along the West border.
05/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE WILL HAVE ALL COMMENTS ENTERED UNDER THIS PERMIT NUMBER ABOVE, (T04BU02317). NO MAJOR STORM WATER CONCERS AT THIS SITE AT THIS TIME. SITE IS ACTIVELY MOVING 18000 CUBIC YARDS OF DIRT AND WILL NOT BE CUTTING IN ROADS UNTIL INITIAL GRADE FOR SECTIONS 1 THROUGH 6 HAVE BEEN COMPLETED.