Permit: T04BU02306

Parcel: 141030280

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
03/05/2012 STORMWATER FOLLOW-UP INSP Approved
01/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval LANDSCAPING WORK AND FINAL STABILIZTION WORK HAS STARTED
12/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval SUB GRADE BEING PLACED
GETTING READY TO PAVE
11/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS MOSTLY STABLE
BASIN WORK STILL NEEDS TO BE DONE
NO CONCERNS AT THIS TIME
10/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
PAVING WORK BEING DONE BY MAGNUM
09/20/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS

BILL WITH KIC ON SITE

-STANDING WATER IN LOADING AREA
-CLEAN UP CONCRETE WASHOUT EAST OF TRAILER
08/30/2006 STORMWATER FOLLOW-UP INSP Correction Required CONCRETE HAS BEEN WASHED OUT NORTH OF CONCRETE STRUCTURE
BASIN SHOWING SIGNS OF STANDING WATER
08/10/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CONCRETE WASH OUT ACCESSIBLE TO SITE WITH OPEN TRENCHES
RE-ESTABLISH WASHOUT
07/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
06/26/2006 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO BILL WITH KIC
-SILT FENCE NEEDS REPAIR/REPLACE (MARKED WITH WHITE X)
-OUTLET PIPES NEED PROTECTION
-WASH OUT IN OKAY CONDITION
06/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
BASIN CLOSE TO GRADE-MAGNUM PAVING TO EX WORK
3 OUTLET PIPES INSTALLED TO THE WEST OF THE BASIN
06/07/2006 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT AT WATER METER NEEDS TO BE CLEANED UP AND ROCK PLACED
06/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval BASIN STILL NEEDS TO BE EXCAVATED
SITE IS ALMOST AT GRADE
PAVING TO START SOON
05/17/2006 STORMWATER FOLLOW-UP INSP Correction Required 1 REINSTALL SILT FENCE ALONG NORTH SIDE WHERE STAKES ARE BROKEN AND SILT FENCE IS NOT BURIED
2 REPAIR SILT FENCE ALONG WEST SIDE WHERE TORN
3 REMOVE DEBRIS IN DRAINAGE AREA IN NEW DRIVEWAY APPROACH-PLACE SEDIMENT CONTROLS
4 SIGN CONCRETE WASH OUT
5 PLACE TRACK OUT ROCK FOR CONSTRUCTION TRAFFIC ENTERING NEIGHBORING DRIVEWAY
6 SWPPP MUST BE ON SITE (ANNOTATED WITH CHANGES)