Permit: T04BU02261

Parcel: 13822023A

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
09/15/2008 STORMWATER INSTALL OF CONTROLS Approved all controls have been removed
09/02/2005 STORMWATER INSTALL OF CONTROLS Correction Required No work completed to stormwater controls since last visit.
08/23/2005 STORMWATER INSTALL OF CONTROLS Correction Required Contractor needs to replace hay bales around bleeder pipe to stop run off. Contractor also needs to clean silt out of basin. Gave copy of inspection to site super.
07/21/2005 STORMWATER INSTALL OF CONTROLS Correction Required Contractor has made some corrections to site. The item that needs to be addressed is grading the southside of property. Getting the dirt off the fence. I have asked contractor to give a date for when this will be done.
07/13/2005 STORMWATER INSTALL OF CONTROLS Correction Required Contractor stopped all corrections to storm water controls. No work completed since last visit. Informed contractor if storm water controls are not up by 7-20-05 I will issue a Stop Work Order. This was my 4 time to site regarding stormwater controls.
07/11/2005 STORMWATER INSTALL OF CONTROLS Correction Required Meet with contrator on site discussed required correction. Contractor starting to install storm water controls.
07/05/2005 STORMWATER INSTALL OF CONTROLS Correction Required Contractor has made no repairs to stormwater controls. Last inspection on 6-27-05.
06/27/2005 STORMWATER INSTALL OF CONTROLS Correction Required Talked to Fred Majors job super. Walked site with Mr. Majors pointed out several items that need to be address.
1) Various location where slit fencing needs to be replaced or repaired.
2) The bleeder pipe in detention basin needs to be capped or plugged (slit running through pipe it into wash)
3) Sand bags need to be placed in scuppers to stop silt from running into wash near entrance to property.
4) Mr. Majors needs to locate a copy of SWPPP.
5) Concrete work on wash bank need to be completed. This area has no protection if we get heavy rains.