Inspection History Details
Inspection Status: Compliance
Inspection History: NPPO PRE PERMIT INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2008 | NPPO PRE PERMIT INSPECTION | Compliance | ||
| 12/09/2004 | NPPO PRE PERMIT INSPECTION | Denied | Monitoring Report requested: 1. Grading prior to NPPO Pre Permit Insp. Approval upon Final Landscape Insp. 2. Preservation and Mitigation Requirements. Protected Native Plants which are proposed to be or are removed from the site, damaged, or destroyed during development shall be replaced by plants of the same genus and species. The Native Plant Preservation Plan shall detail the size and value of replacement plants to demonstrate that the monetary value of replacement plants shall be equal to the monetary value of each genus and species of Protected Native Plant which is removed from the site, damaged, or destroyed. Alternately, plants may be replaced on a one-to-one basis (genus, species, and size) from the site or from nursery/salvage stock to satisfy the requirement of monetary replacement value. (Ord. No. 9246, §1, 10/11/99) 3. On-site monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation shall be provided during project construction at the expense of the developer for all residential development that is over five (5) acres and for all commercial and industrial development that is over one (1) acre. An individual who is qualified in arid lands native plant resource identification and protection as specified in Sec. 3.8.4, General Provisions and Requirements, shall perform the monitoring. The monitor shall provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports shall be submitted to the Development Services Department (DSD) for the project file. (Ord. No. 9392, §1, 5/22/00) |