Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU02254
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2006 | STORMWATER FOLLOW-UP INSP | Approved | Contractor stabilized all areas. | |
| 06/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor stabilized all areas. | |
| 06/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor continues to work on site stabilization. | |
| 05/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor continues to work on final stabilizion. Contractor needs to clean concrete off street northside of project. | |
| 05/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installing sprinkler system in rear comm. area. | |
| 04/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor starting to stock piling material for site stabilizion. | |
| 04/05/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to finish stabilizing site. | |
| 03/20/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor removed wattle from street. No activity on site. | |
| 03/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Remove wattle from street and install in scupper. | |
| 02/17/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTRACTOR NEEDS TO REMOVE D.G. FROM STREET | |
| 02/07/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Keep waddle installed in scuppers until site is stabilized. | |
| 01/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to keep waddle installed properly on scuppers, keep site wet (blowing dust) and clean gravel pad (track out). | |
| 01/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to address: 1- Install waddle in all scuppers. 2- Install stormwater controls northeast corner from end of swell to fence. 3- Install barrier around detention basin north west corner of project. |
|
| 12/16/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install stormwater controls in sidewalk scupper to stop silt run off. Also need to install controls on northeast side of project. End of swell. | |
| 12/02/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install stormwater controls at scupper outlets to stop silt run off. | |
| 11/14/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor given copy of Stormwater Ordinance. Contractor needs to clean spoil pile on northwest corner of project. (Lerdo and San Fernando) |
|
| 10/27/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean silt off Lerdo Rd. 2- Reinstall stormwater controls on northwest side of property. Spoke to site super in regards to issues. |
|
| 10/13/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up concrete wash-out area. Wash out material close to running for property. Talked to super in regards to issue. | |
| 09/29/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Replace or repair silt stormwater controls on northwest corner of property. | |
| 09/14/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to extend waddle or silt fence on northwest corner of Phase II |