Permit: T04BU02254

Parcel: 138190430


Addresses:

212 W MEDINA RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02254

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
09/21/2006 STORMWATER FOLLOW-UP INSP Approved Contractor stabilized all areas.
06/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor stabilized all areas.
06/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor continues to work on site stabilization.
05/18/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor continues to work on final stabilizion. Contractor needs to clean concrete off street northside of project.
05/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installing sprinkler system in rear comm. area.
04/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor starting to stock piling material for site stabilizion.
04/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to finish stabilizing site.
03/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor removed wattle from street. No activity on site.
03/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval Remove wattle from street and install in scupper.
02/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval CONTRACTOR NEEDS TO REMOVE D.G. FROM STREET
02/07/2006 STORMWATER FOLLOW-UP INSP Correction Required Keep waddle installed in scuppers until site is stabilized.
01/23/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to keep waddle installed properly on scuppers, keep site wet (blowing dust) and clean gravel pad (track out).
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to address:
1- Install waddle in all scuppers.
2- Install stormwater controls northeast corner from end of swell to fence.
3- Install barrier around detention basin north west corner of project.
12/16/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install stormwater controls in sidewalk scupper to stop silt run off. Also need to install controls on northeast side of project. End of swell.
12/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to install stormwater controls at scupper outlets to stop silt run off.
11/14/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor given copy of Stormwater Ordinance.
Contractor needs to clean spoil pile on northwest corner of project. (Lerdo and San Fernando)
10/27/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean silt off Lerdo Rd.
2- Reinstall stormwater controls on northwest side of property.
Spoke to site super in regards to issues.
10/13/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean up concrete wash-out area. Wash out material close to running for property. Talked to super in regards to issue.
09/29/2005 STORMWATER FOLLOW-UP INSP Correction Required Replace or repair silt stormwater controls on northwest corner of property.
09/14/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to extend waddle or silt fence on northwest corner of Phase II