Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: GRADING - INTERMEDIATE
Permit Number - T04BU02209
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2008 | GRADING - INTERMEDIATE | Not ready for Inspection | I MET ON SITE WITH DAVE ROBERTS REGARDING GRADING INSSUES | |
02/14/2008 | GRADING - INTERMEDIATE | Correction Required | (2) HANDICAP RAMPS NEED TO BE CONSTRUCTED. MIKE GARDNER 795-1978 EXT 22, WILL SCHEDULE AND UPDATE ME NEXT WEEK REGARDING CONSTRUCTION. |
|
01/31/2008 | GRADING - INTERMEDIATE | Correction Required | NO CONSTRUCTION ACTIVITY MIKE GARDNER WILL CALL BACK NEXT WEEK REGARDING CONSTRUCTION OF HANDICAP RAMPS |
|
08/23/2007 | GRADING - INTERMEDIATE | Denied | SITE WALK THRU WITH MIKE GARDNER SIERRA PACIFIC HOMES AND JACK FOSTER RICK ENGINEERING. 1. COMPLETE CONSTRUCTION OF ALL SITE WORK. 2. CONSTRUCT TO GRADING PLAN SPECIFICATIONS. 3. REMOVE SEDIMENT FROM DRAINAGE AT DRIVEWAY ENTRY CULVERT. 4. REMOVE SEDIMENT FROM WATER HARVEST AREAS. 5. REMOVE STOCKPILES FROM UNBUILT LOTS. 6. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 7. PROVIDE AN ARIZONA REGISTERED P.E CERTIFICATION LETTER PRIOR TO SCHEDULING FINAL GRADING INSPECTION. |
|
04/26/2007 | GRADING - INTERMEDIATE | Partial Approval | THERE ARE A TOTAL OF (20) LOTS AT THIS SUBDIVISION: (5) UN-BUILT LOTS (3) HOMES UNDER CONSTRUCTION (12) COMPLETED HOMES PUBLIC STREETS AND SIDEWALKS ARE NOT COMPLETE. |