Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2010 | GRADING - INTERMEDIATE | Approved | ||
| 02/16/2010 | GRADING - INTERMEDIATE | Continued | TOOK PICTURES OF STORM WATER DRAINAGE FLOW PATTERNS WHERE WATER ENTERS THE SITE ALONG THE WEST SIDE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 02/11/2010 | GRADING - INTERMEDIATE | Continued | TOOK PICTURES OF DRAINAGE PATTERNS ON TOP OF HILL AT ADJACENT PROPERTY | |
| 06/30/2009 | GRADING - INTERMEDIATE | Continued | MET W/ DEVELOPER ON HOUSING SET BACKS AND DRAINAGE BETWEEN HOUSES. SOME HOUSES BUILT BEFORE CURRENT DEVELOPER TOOK OVER SITE WERE PLACED CLOSER THAN THE MIN. 3' SET BACK FROM THE PROPERTY LINE. CURRENT DEVELOPER HAS ADDRESED THIS ISSUE BY REMOVING A PORTION OF THE BLOCK WALLS ON HOUSES THAT ENCROACH AND INSTALLING DRAINAGE PER APPROVED GRADING PLAN WITH WALL OPENINGS AND ROCK CHANNELS IN ORDER TO CARRY STORM WATER AWAY FROM HOUSES. DRAINAGE CHANNEL AT EAST BOUNDRY OF SITE HAS BEEN WIDENED AND ROCKED SLOPES HAVE BEEN GROUTED. RET/DET BASINS HAVE BEEN RE-CONSTRUCTED TO MEET DEMENSIONS ON THE APPROVED GRADING PLAN. ROCK DRANAGE SWALE HAS BEEN CONSTRUCTED BETWEEN HOUSES AT CENTER OF SITE. RETAINING WALLS ARE BEING INSTALED ON LOTS THAT BACK UP TO AN EXISTING SLOPE ALONG THE NORTH PERIMETER OF THE SITE, SOME EROSION HAS TAKEN PLACE AROUND EXISTING WALLS AND WILL BE ADDRESSED PRIOR TO FINAL GRADING APPROVAL. SCUPPER OUTLET LOCATED ON SE CORNER OF SITE HAS BEEN RE-CONSTRUCTED AND REPAIRED. NO STORM WTER CONCERNS AT THIS TIME. |
|
| 04/02/2009 | GRADING - INTERMEDIATE | Continued | MET WITH COT REVIEW ENGINEER, SITE ENGINEER, DEVELOPER, AND PROJECT PARTNER TO DISCUSS WHAT IS REQUIRED FOR SITE WORK TO COMPLETE THE PROJECT. SITE MUST HAVE A REVISED PLAN SHOWING ANYAND ALL CHANGES MADE TO THE ORIGINAL APPROVED GRADING PLAN, BUILD PER THAT PLAN. |
|
| 02/24/2009 | GRADING - INTERMEDIATE | Correction Required | MET DEVELOPER ON SITE W/ THE REVIEW ENGINEER ON REQUIREMENTS TO FINAL THE GRADING PERMIT. PRIOR TO FINAL GRADING APPROVAL: 1) PROVIDE REVISION ON MAIN CHANNEL CONSTRUCTION AT WEST SIDE OF SITE. CURRENT DESIGN DOES NOT ADDESS EXISTING DRAINAGE ISSUES. 2) PROVIDE AN APPROVED PLAN SHOWING CONTROL OF CURRENT STORM WATER RUN-ON AND HOW IT WILL BE CONVEYED AWAY FROM RESIDENCES. 3) REPAIR ALL EROSION DAMAGE AT VARIOUS SCUPPERS, CATCH BASINS, AND DRAINAGE CHANNELS. 4) COMPLETE ALL REMAINING SITE WORK. 5) PROVIDE A CERTIFICATION FROM THE ENGINEER OF RECORD STATING THAT ALL STORM WATER DRAINAGE STRUCTURES WERE COMPLETED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS. 6) ALL REVISIONS AND CHANGES TO THE ORIGINAL APPROVED PLANS MUST BE APPROVED BY THE CITY OF TUCSON. |
|
| 05/27/2008 | GRADING - INTERMEDIATE | Correction Required | MET WITH DEVELOPER AND REVIEW ENGINEER ON SITE TO DISCUSS WHAT IS REQUIRED TO COMPLETE THE PROJECT. COMPLETE ALL SITE WORK AS SHOWN ON THE APPROVED GRADING PLAN; PROVIDE AN AS-BUILT; CERTIFY ALL DRAINAGE WAYS AND DET/RET BASINS. |
|
| 05/12/2008 | GRADING - INTERMEDIATE | Correction Required | INSPECTED NE CORNER OF SITE AT RET/DET BASIN OUTLET PER PHONE CALL FROM COT DOT. BASIN SLOPE AT OUTLET HAS ERODED, EXPOSING PVC PIPE. CONTRACTOR/OWNER MUST FIX AND RE-STABILIZED SLOPE. SITE WORK ON SITE HAS NOT BEN COMPLETED - NO CONTACT WITH BUILDER/OWNER. | |
| 03/07/2007 | GRADING - INTERMEDIATE | Partial Approval | MOST SITE WORK HAS BEEN COMPLETED, HOWEVER THE MAIN RET/DET BASIN IS STILL UNDER CONSTRUCTION |