Permit: T04BU01884

Parcel: 137279940

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU01884

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
04/06/2006 STORMWATER FOLLOW-UP INSP Approved Site has been stabilized.
03/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor placed hydroseed for phase II.
03/20/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to stabilize phase II. No activity on phase II for 70 days. Contacted Wade site super in regards to stabilizing phase II. Wade said it would be completed on Wed. 3/22/06.
03/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to stabilize phase II.
02/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval CONTRACTOR NEEDS TO STABILIZE PHASE II
02/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to stabilize phase II.
01/23/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor still needs to stabilize area in phase II.
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval Controls in place.
Contractor still needs to stabilize area in phase II.
12/16/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install waddle in curb opening per new SWPPP plan. Spoke to Wade site super via cell phone at approx. 0950.
12/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time. Contractor framing storage units.
11/15/2005 STORMWATER FOLLOW-UP INSP Correction Required No one on site. Contractor needs to install stormwater controls or Stabilize area that has been cleared and grubbed
09/29/2005 STORMWATER FOLLOW-UP INSP Cancelled
09/15/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to address:
1- Construction entrance pad. Not working.
2- Clean up track-out on to street.
3- Reinstall waddle in front of catch basin northside of property.
08/23/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair pr replace silt fence and waddle as needed.
Contacted Wade the site super and informed him. Via cell phone at approx. 1045 hours.
08/10/2005 STORMWATER FOLLOW-UP INSP Correction Required Contracor needs to:
1- Clean up all track out and silt run off.
2- Provide positive flow on northeast corner of property to stop run off.
07/05/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installed waddle across catch basin on north side of the property per last inspection on 6-27-05. Contractor needs to re-install slit fence on east side of property next to open trench.
06/27/2005 STORMWATER FOLLOW-UP INSP Correction Required Walked site with Wade Bingham, site super. Silt fencing needs replacing or repairing in various locations, catch basin on north side of property needs to be capped, slit fence or waddle to stop slit entrusion to catch basin.