Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2005 | STORMWATER FOLLOW-UP INSP | Approved | THE MAJORITY OF THE SITE HAS BEEN STABILIZED, A STORM WATER FINAL INSPECTION WILL BE SCHEDULED WHEN CONTROLS ARE NO LONGER NEEDED. | |
| 11/16/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | PARTIAL APPROVAL. 1) STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. 2) CONCRETE WASH OUT AREA WILL BE UTILIZED TO HELP RAISE THE FLOOR ELEVATION ALONG THE WEST PARIMETER. 3) POST AZPDES FORM AT THE ENTRANCE OF THE CONSTRUCTION SITE. * NO OTHER STORM WATER CONCERNS AT THIS TIME. |