Permit: T04BU01740

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
11/09/2006 STORMWATER FOLLOW-UP INSP Approved
06/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD SHAPE
NO POSTED CONCRETE WASH OUT ONSITE FOR LAST 2 HOMES BEING BUILT
THERE IS A PIT FOR WASH OUT IN DRIVEWAY LOCATION
05/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD SHAPE
WILL BE READY FOR FINAL GRADING INSP SOON
READY FOR FINAL ASSURANCE INSP NOW
04/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD SHAPE
PER SITE SUPER APROX 1 MONTH BEFORE FINAL GRADING
03/29/2006 STORMWATER FOLLOW-UP INSP Correction Required CONCRETE WASH OUT NEEDS TO BE IN PLACE AND POSTED (SIGNED)
SEDIMENT CONTROLS AT ENTRANCE AND AT SCUPPERS IN GOOD SHAPE
SITE NEEDS SWEEPING AT CONSTRUCTION AREAS
03/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTIONS HAVE ALL BEEN MADE
-CAUTION SUB CONTRACTORS ABOUT USING DESIGNATED WASH OUT ONLY
03/08/2006 STORMWATER FOLLOW-UP INSP Correction Required MET WITH JESSE FROM PEPPER VINER HOMES
SWPPP MAP IS IN CONSTRUCTION OFFICE AND UPDATED
NOI LAMINATED AND READY TO POST
SEDIMENT CONTROLS AT WEIR OF NW BASIN HAVE BEEN OKAYED TO BE REMOVED
INLET OF NW BASIN NEEDS TO BE PROTECTED
INLET OF SW BASIN WILL BE PROTECTED (WATTLE WILL BE REPLACED)
WATTLE TO BE PLACED AT ENTRANCE TO PROJECT AT WEST SIDE
OKAY TO REMOVE SEDIMENT CONTROLS AT SW CORNER OF PROJECT (DRAINAGEWAY)
03/06/2006 STORMWATER FOLLOW-UP INSP Correction Required PROTECT INLETS TO DETENTION/RETENTION BASINS AS PROSCRIBED IN SWPPP
PROTECT DRAINAGEWAY AS PROSCRIBED BY SWPPP
PROVIDE CONCRETE WASHOUT
POST NOI/AZPDES
08/22/2005 STORMWATER FOLLOW-UP INSP Correction Required ALL STORMWATER SYSTEMS IN PLACE.
08/08/2005 STORMWATER FOLLOW-UP INSP Correction Required SPOKE WITH SITE SUPERVISOR STUART AVENENTI. ASKED THAT OFFSITE TRACKING BE CLEANED UP. THAT SCUPPERS HAVE SEDIMENT CONTROLS PLACED AT ENTRANCE AND THAT VEHICLES ARE PROHIBITED FROM JUMPING CURBS TO PREVENT TRACKING OR THAT NORMAL SWEEPING OCCURS. STUART STATED THAT HE HAD SPOKEN WITH DAVE ROBERTS AND WOULD LIKE AN ANSWER REGARDING THE WEST END OF TH EPROPERTY W/REGARDS TO SCUPPERS DRAINING DIRECTLY ON TO SIDEWALKS.
07/25/2005 STORMWATER FOLLOW-UP INSP Partial Approval Met with an assisstant project manager for Bert Rodriguez. Instructed the assistanct of some minor storm water concerns and notified of the basin certification requirements before the last homes will have an assurance releases approved. Also gave information for truncated domes within sidewalk handicap ramps.
07/07/2005 STORMWATER FOLLOW-UP INSP Partial Approval FOLLOW-UP INSPECTION ONLY. WORK HAS BEGUN FOR THE PIA IMPROVEMENTS. NO MAJOR STORM WATER CONCERNS AT THIS TIME. PARIMETER WALL IS NEAR COMPLETE AT THIS TIME.
06/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval Site is in fairly good condition. A new drainage channel is being constructed along the right of way and will need to be addressed before monsoon rain come. Re-inspect on Wednesday July the 6th.
06/10/2005 STORMWATER FOLLOW-UP INSP Partial Approval call was received form the contractor invoved with the PIA work beginning on Monday teh 13th. Inspectionwill be made on the 13th.
05/09/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE IS PROGRESSING ALONG WITHOUT ANY MAJOR STORM WATER CONCERNS. CONSTRUCTION HAS BEGUN FOR THE BRIDGE AND ENTRANCE OFF OF RITA INTO THE FRY'S SHOPPING CENTER. ALSO PIA WORK CONTINUES ON THE SHOULDER OF HOUGHTON JUST BEFORE RITA RD. NO MAJOR STORM WATER CONCERNS AT THIS TIME. WILL NEED TO KEEP AN EYE ON CONSTRUCTION ACTIVITY WITHIN THE WASH LOCATED AT THE S. PERIMETER.
03/08/2005 STORMWATER FOLLOW-UP INSP Partial Approval THE REQUESTED REPAIRS FOR THE SILT-FENCING HAVE BEEN ADDRESSED AND NO OTHER MAJOR STORM WATER CONCERNS AT THIS TIME.