Permit: T04BU01621

Parcel: 11501155E


Addresses:

2350 N 6TH AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU01621

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
10/20/2006 STORMWATER FOLLOW-UP INSP Approved
10/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK NOT COMPLETED, STORM WATER CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED.
THE FINAL GRADING INSPECTION FOR PERMIT # T04BU01621 HAS NOT BEEN APPROVED, THEREFORE THE PERMIT IS STILL OPEN. CALL FOR INSPECTION WHEN SITE IS COMPLETED.
08/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval STORM WATER FOLLOW-UP INSPECTION #09154 CAN NOT BE FINALED UNTIL THE SITE IS 100% STABILIZED.
07/07/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1) ALL SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED.
2) A PRELIMINARY GRADING INSPECTION (9185) MUST BE CALLED IN PRIOR TO SITE WORK COMPLETION (MIN 2-WEEKS).
3) A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD IS REQUIRED STATING THAT THE RETENTION/DETENTION BASIN ON SITE WAS BUILT PER PLAN AND PERFORMS IN ACORDANCE WITH PRESCRIBED STANDARDS.
4) SWEEP UP ROCK AND DEBRIS OFF 6TH AVE.
05/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval ESTABLISH A DESIGNATED CONCRETE WASH-OUT AREA WITH A SIGN.
ENSURE STORM WATER CONTROLS ARE MAINTAINED AS NECESSARY.
SWEEP TRACKING ON TO PUBLIC ROADWAY AS NEEDED.
SHOW ANY CHANGES TO SWPPP, DOCUMENT, SIGN AND DATE.
CALL FOR INSPECTION PRIOR TO PAVING.
04/29/2005 STORMWATER FOLLOW-UP INSP Cancelled RESCHEDULED FOR MONDAY MAY 2ND.
04/04/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME
03/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORM WATER CONCERNS AT THIS TIME.
02/08/2005 STORMWATER FOLLOW-UP INSP Partial Approval Controls are in place per SWPPP. Ensure inspections are performed and documented. Need to establish a concrete wash out area. Maintain storm water controls as needed.
01/31/2005 STORMWATER FOLLOW-UP INSP Partial Approval Continue to ensure storm water controls are implemented and maintained per SWPPP and letter dated 14 Jan, 2005. Remove stockpile on West side of property to original grade.
01/28/2005 STORMWATER FOLLOW-UP INSP Correction Required THE SUPERINTENDENT FOR THIS PROJECT HAS BEEN REQUESTED OF THE NEEDED CORRECTIONS TO BECOME IN COMPLIANCE. A RE-INSPECTION WILL BE OCCURING TODAY MONDAY JAN, 31ST.