Permit: T04BU01387

Parcel: 112050570


Addresses:

3109 N OLSEN AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU01387

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
09/30/2005 STORMWATER FOLLOW-UP INSP Approved
09/26/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
08/24/2005 STORMWATER FOLLOW-UP INSP Correction Required COMPLETE ITEMS 1,3 & 5 ON PREVIOUS INSPECTION BY FRIDAY 8-26-05.
ITEM 2 AND 4 OK.
08/10/2005 STORMWATER FOLLOW-UP INSP Correction Required FLOODING COMPLAINT AND FOLLOW-UP WITH CYNTHIA 861-1179 REGARDING FLOODING IMPACT TO PROPERTY AT 1935/1937 E. HEDRICK. THESE PROPERTIES ARE LOCATED IN THE FLOODPLAIN. THE HIGH WATER WAS CAUSED BY A 1.2" RAINFALL. SOME DISCHARGE FROM WALL FOUNDATION WEEP HOLES ON THE SOUTH PERIMETER OF THE CONSTRUCTION SITE MAY HAVE HAD SOME INFLUENCE ON THE ADJACENT PROPERTY. AREAS DRAINS AND AND 8" STORM DRAINAGE SYSTEM ON THE SOUTH PERIMETER OF THIS SITE CONVEYED MOST OF THE STORMWATER TO THE WEST PERIMETER.
THE SITE SUPERINTENDENT WAS GIVEN THE FOLLOWING PUNCHLIST.
1. REPAIR OR REPLACE SEDIMENT AND EROSION CONTROLS ON THE WEST PERIMETER.
2. CLEAN-UP SEDIMENT AND SILT THAT ESCAPED THE SITE DURING YESTERDAYS 1.2" RAINFALL.
3. SWEEP THE STREET AS NEEDED ON THE EAST PERIMETER UNTIL THE PAVEMENT IS INSTALLED.
4. PROVIDE POSITIVE DRAINAGE FROM EAST TO WEST ON THE SOUTHERN PERIMETER, TO ACCOMODATE WALL FOUNDATION DRAINAGE.
5. RE-ESTABLISH THE RETENTION/DETENTION BASIN.
07/29/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT CHANGES TO THE SITE WORK SINCE THE 7-22-05 INSPECTION.
07/22/2005 STORMWATER FOLLOW-UP INSP Partial Approval SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE WORK IS COMPLETED. NO STORM WATER CONCERNS AT THIS TIME.

PRIOR TO OCCUPANCY (ENGINEERING APPROVAL) OF BLDG'S, THE SITE MUST HAVE:
1) NO LIFE/SAFTEY ITEMS OUTSTANDING.
2) ADEQUATE PARKING PER APPROVED PLAN FOR ALL OCCUPANTS.
3) TRASH ENCLOSURES COMPLETED PER PLAN.
4) PUBLIC ACCESS FREE FROM OBSTRUCTIONS (CONST. DEBRIS, MATERIAL, AND EQUIP).
5) SEPARATE ALL CONSTR ACTIVITY FROM OCCUPIED BLDG'S.
6) DRAINAGE STRUCTURES COMPLETED PER PLAN.
7) PROVIDE AN APPROVED SET OF PLANS WITH ANY REVISIONS OR CHANGES THAT WERE MADE.
05/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval CONTINUE TO SWEEP STREET IN FRONT OF PROJECT TO ENSURE ROCKS AND MATERIAL IS NOT TRACKED OFF SITE.
JASON BOYSEL 271-6985 WILL TAKE OVER PROJECT TEMPORARILY
03/31/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORM WATER CONCERNS AT THIS TIME
03/04/2005 STORMWATER FOLLOW-UP INSP Partial Approval PERFORMED STORM WATER FOLLOW UP IN RESPONSE TO A COMPLAINT.
ASK CONTRACTOR TO RE-ESTABLISH HAY WADDLE IN FRONT OF SITE TO ENSURE ALL SILT IS KEPT ON SITE.
NO OTHER STORM WATER OR DRAINAGE CONCERNS AT HTIS TIME.
02/23/2005 STORMWATER FOLLOW-UP INSP Partial Approval NEED TO POST NOI AND/OR AZPDES AUTHORIZATION NUMBER ON SITE. ENSURE STORM WATER INSPECTIONS ARE ACCOMPLISHED AND DOCUMENTED IN ACCORDANCE WITH THE SWPPP. NEED TO RE-DRESS ROCK AND WADDLE AT ENTRANCE TO SITE UNTIL CURBING AND SIDEWALK IS INSTALLED. NO OTHER STORM WATER CONCERNS AT THIS TIME.
01/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
01/05/2005 STORMWATER FOLLOW-UP INSP Correction Required JERRY BELL (520) 990-6432.
1. PROVIDE ROCK FOR A STABILIZE CONSTRUCTION ENTRANCE.
2. PROVIDE A DESIGNATED CONCRETE WASHOUT AREA.