Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T04BU01387
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2004 | STORMWATER INSTALL OF CONTROLS | Approved | ||
11/24/2004 | STORMWATER INSTALL OF CONTROLS | Cancelled | ||
10/27/2004 | STORMWATER INSTALL OF CONTROLS | Correction Required | PROVIDE SEDIMENT AND EROSION CONTROL AT THE WALL OPENINGS ON THE WEST PERIMETER | |
10/07/2004 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | I REVIEWED THE SWPPP WITH JERRY BELL (520) 990-6432. 1. POST SIGN WITH AZPDES AUTHORIZATION ETC... PER PART IV J. 2. 2. PROVIDE A CONCRETE WASHOUT AREA 3. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 4. PROVIDE PERIMETER SEDIMENT AND EROSION CONTROLS. 5. CALL FOR INSPECTION OF STORMWATER CONTROLS BEFORE GRUBBING THE ENTIRE SITE. |
|
09/07/2004 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | I MET WITH APRIL ORTIZ AND DAN MORITZ (241-8475) OF PATHWAYS DEVELOPMENT. THIS INSPECTION WAS DONE IN CONJUNCTION WITH THE NPPO INSPECTION. MR. MORITZ WILL NOTIFY MICHEAL BARTLETT TO SET UP A STORMWATER PRE-CONSTRUCTION MEETING. |