Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04BU01330

Parcel: 11205283F


Addresses:

2990 N CAMPBELL AV

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
07/21/2005 STORMWATER FOLLOW-UP INSP Approved MET W/SITE SUPERINTENDENT, DISCUSSED CHANGES MADE TO TRASH ENCLOSURE ON SE CORNER OF SITE AND CHANGES MADE TO THE LOCATION OF THE SCUPPER ON THE NW SIDE. SITE WILL BE PAVED BY NEXT WEEK.
06/16/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1) RE-ESTABLISH A DEFINED CONCRETE WASH-OUT AREA AS PRESCRIBED IN YOUR SWPPP.
2) RE-ESTABLISH SEDIMENT CONTROLS AROUND CATCH BASIN LOCATED AT NW CORNER OF SITE.
3) SEDIMENT/STORM WATER CONTROLS MUST REMAIN UNTIL SITE IS 100% STABILIZED.
4) CALL FOR A FOLLOW-UP INSPECTION AFTER PAVING OF SITE.
05/04/2005 STORMWATER FOLLOW-UP INSP Partial Approval PLACE A BARRICADE AROUND SITE WORK ON NE CORNER OF SITE, (SNOW FENCING, CAUTION TAPE ...) TO PREVENT PUBLIC ACCESS. CALL FOR INSPECTION PRIOR TO PAVING SITE.
04/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval PLace sand bags around inlet to catch basin
Sweep and remove dirt from the parking areas for dust control.
call for reinspection.
03/15/2005 STORMWATER FOLLOW-UP INSP Partial Approval ENSURE SEDIMENT FROM OFF SITE UTILITY TIE-INS IS CONTROLLED AND/OR SWEPT AS NEEDED.
NO OTHER STORM WATER CONCERNS AT THIS TIME.
02/23/2005 STORMWATER FOLLOW-UP INSP Partial Approval CLEAN OUT SOIL AND DEBRI FROM STORM WATER CATCH BASIN LOCATED ON THE NW CORNER OF SITE, ENSURE BASIN IS PROTECTED. STORM WATER CONTROLS MAY NEED TO BE RE-ESTABLISHED WHEN EXTERIOR SITE WORK BEGINS. CALL FOR INSPECTION PRIOR TO THE START OF EXTERIOR GRADING AND PAVING. NO OTHER STORM WATER CONCERNS AT THIS TIME.
02/07/2005 STORMWATER FOLLOW-UP INSP Partial Approval 1. SWEEP THE PUBLIC STREET AND THE PARKING LOT OF ALL SOIL AND SEDIMENT. ASAP
2. PROVIDE SEDIMENT AND EROSION CONTROLS AT OFFSITE STORM DRAINAGE INLETS THAT ARE IMPACTED BY SEWER TIE-IN AND TRACKED MATERIAL.
3. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE.
4. RESET THE SWPPP CONTROLS AT THE NORTHWEST OUTFALL.
JIM KELLEY 245-4213/622-2929
01/03/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
12/01/2004 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS