Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2005 | STORMWATER FOLLOW-UP INSP | Approved | MET W/SITE SUPERINTENDENT, DISCUSSED CHANGES MADE TO TRASH ENCLOSURE ON SE CORNER OF SITE AND CHANGES MADE TO THE LOCATION OF THE SCUPPER ON THE NW SIDE. SITE WILL BE PAVED BY NEXT WEEK. | |
| 06/16/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) RE-ESTABLISH A DEFINED CONCRETE WASH-OUT AREA AS PRESCRIBED IN YOUR SWPPP. 2) RE-ESTABLISH SEDIMENT CONTROLS AROUND CATCH BASIN LOCATED AT NW CORNER OF SITE. 3) SEDIMENT/STORM WATER CONTROLS MUST REMAIN UNTIL SITE IS 100% STABILIZED. 4) CALL FOR A FOLLOW-UP INSPECTION AFTER PAVING OF SITE. |
|
| 05/04/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | PLACE A BARRICADE AROUND SITE WORK ON NE CORNER OF SITE, (SNOW FENCING, CAUTION TAPE ...) TO PREVENT PUBLIC ACCESS. CALL FOR INSPECTION PRIOR TO PAVING SITE. | |
| 04/13/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | PLace sand bags around inlet to catch basin Sweep and remove dirt from the parking areas for dust control. call for reinspection. |
|
| 03/15/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | ENSURE SEDIMENT FROM OFF SITE UTILITY TIE-INS IS CONTROLLED AND/OR SWEPT AS NEEDED. NO OTHER STORM WATER CONCERNS AT THIS TIME. |
|
| 02/23/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | CLEAN OUT SOIL AND DEBRI FROM STORM WATER CATCH BASIN LOCATED ON THE NW CORNER OF SITE, ENSURE BASIN IS PROTECTED. STORM WATER CONTROLS MAY NEED TO BE RE-ESTABLISHED WHEN EXTERIOR SITE WORK BEGINS. CALL FOR INSPECTION PRIOR TO THE START OF EXTERIOR GRADING AND PAVING. NO OTHER STORM WATER CONCERNS AT THIS TIME. | |
| 02/07/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1. SWEEP THE PUBLIC STREET AND THE PARKING LOT OF ALL SOIL AND SEDIMENT. ASAP 2. PROVIDE SEDIMENT AND EROSION CONTROLS AT OFFSITE STORM DRAINAGE INLETS THAT ARE IMPACTED BY SEWER TIE-IN AND TRACKED MATERIAL. 3. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 4. RESET THE SWPPP CONTROLS AT THE NORTHWEST OUTFALL. JIM KELLEY 245-4213/622-2929 |
|
| 01/03/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 12/01/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS |