Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU01265
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2005 | STORMWATER FOLLOW-UP INSP | Approved | SITE CONSTRUCTION IS COMPLETE. | |
| 02/09/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | THIS RECORD WAS DELETED FROM FINAL GRADING INSPECTION CATEGORY AND COPIED TO THE STORMWATER FOLLOW-UP CATEGORY BY JOHN BRUCKMEIER ON 4-14-05. MET WITH SUNDT SUPERINTENDENT DOUG BOLEN. I EXPLAINED THE NEED TO REMOVE ALL VEHICLES, (SITE LABORES OR MAINTENANCE), AWAY FROM THE RIGHT-OF-WAY. DURING THE VIOLATION INSPECTION, I REQUESTED TO HAVE ONE LUBE MAINTENANCE TRUCK AND ONE PERSONAL VEHILCE BELONGING TO A LABORER REMOVED OUT OF THE RIGHT-AWAY. ALSO EMPHASIZED HAVING A SWEEPER SCHEDULED TO SWEEP THE ROAD EACH DAY. DOUG EXPLAINED HE ALREADY HAS DIGGINS CONTRACTED ONCE A DAY TO SWEEP THE ROAD. FURTHER INSPECTONS REGARDING THE ISSUES WILL BE CONDUCTED. |
|
| 01/26/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPAIR OR REPLACE SILT FENCE. 2. MAINTAIN CONSTRUCTION ENTRANC AND SWEEP PUBLIC R.O.W. 3. REMOVE CONCRETE WASHOUT FROM R/D BASIN. |
|
| 01/19/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | REPAIR OR REPLACE THE DOWNED SILT FENCE ON THE SOUTH AND WEST PERIMETER. | |
| 12/22/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | PROVIDE A V-DITCH/BERM IN LIEU OF SILT FENCE AT THE TEMPORARY OPENING IN THE SOUTH FENCE. | |
| 11/24/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | CORRECTIONS HAVE BEEN COMPLETED. | |
| 11/17/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SWEEP TANQUE VERDE ROAD AS NEEDED TO PREVENT TRACKING UNTIL PAVING IS COMPLETE. 2. MAINTAIN SILT FENCE ON SOUTH PERIMETER. 3. CLEAN-UP CONCRETE WASHOUT AND CONFINE ALL CONCRETE WASHOUT IN DESIGNATED AREA. |
|
| 11/15/2004 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
| 10/11/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. |