Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2004 | FIRE SPKLR - FINAL | Not ready for Inspection | 1. Supervise water supply valves to fire sprinklers with lock and chain. 2. Provide hydraulic calculation data plate at riser. 3. Must test waterflow alarm. 4. Provide spare sprinkler head box with 17/32" orifice sprinklers. |