Permit: T04BU01240

Parcel: 12901044C


Addresses:

1940 E BROADWAY BL

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
01/19/2007 STORMWATER FOLLOW-UP INSP Approved Contractor stabilized all areas.
10/30/2006 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to repair the south and east side of 220 S. Norris, repair right-a-way area on east side and alley on south side. Return to pre-construction condition or better.
10/26/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean silt off Norris.
2- Install silt fence on eastside of project.
3- install construction entrance (2) off Norris.
4- Have engineer address existing flow on south side of project. Flows north on to site.
10/06/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Install SWPPP controls on the east side of project, alonf Norris.
2- Stop all wash out into street (Norris). Provide wash out area for all subs.
10/03/2006 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Jerry site super in regarding SWPPP controls along Norris. Contractor will need to install temp controls around spoil pile from utility trench.
09/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to install stormwater controls around spoil material on eastside of building. Spoke to Terry Jolly 801-781-0447 site super.
09/05/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Keep streets clean around project.
2- Stake down wattle around site. Replace wattle as needed.
3- Clean up mason wash out around site.
Spoke to site super inregards to.
08/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor wants to keep Norris Rd and install controls along Norris where curb is being removed.
08/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to address:
1- Clean Norris (track out and concrete)
2- Clean around mason mixer. Replace stormwater controls around mixer wattle not working.
3- Provide mason wash out area.
4- Address erosion southside of project.
Spoke to site super in regards to.
07/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
06/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
06/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval Met contractor onsite, contractor cleaned track out on to street. Explained to site super that street around site need to be keep clean.
06/08/2006 STORMWATER FOLLOW-UP INSP Correction Required Issued Correction Notice. Contractor has 24 hours to clean track out leaving site on east side of project. Spoke to site super in regards to issues.