Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/02/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
Completed pre-con meeting. |
| 05/31/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Correction Required |
Issued correction notice to conctractor. Contractor started demo and clearing site with no stormwater controls installed. Contractor has 2 days to get controls installed. If contractor is unable to install controls a stop work order will be issued. |