Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T04BU01217
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2014 | GRADING - INTERMEDIATE | Approved | ||
04/22/2009 | GRADING - INTERMEDIATE | Continued | GRADE AND DRAINAGE PROBLEMS CAUSING EROSION ADJACENT TO A.D.A TRAIL AT SOUTH END OF SITE. I MET WITH STEWART AVENENTI 906-4239 PEPPERVINER, LUIS VASQUEZ EAGLEROCK CONST. AND BOB MALLORY SWPPP MAINTENANCE. 29 HOMES ARE BUILT WITH 2 UNDER CONSTRUCTION AT THIS TIME. THERE ARE 79 LOTS ON THIS SUBDIVISION. A REVISED AND C.O.T. APPROVED GRADING PLAN WILL BE REQUIRED FOR A.D.A. TRAIL MODIFICATIONS |
|
10/25/2007 | GRADING - INTERMEDIATE | Partial Approval | CHECKED LANDSCAPE AND LOT GRADING ON MODEL HOMES AND DRAINAGE CONCERNS AT ADA TRAILHEAD | |
10/08/2007 | GRADING - INTERMEDIATE | Correction Required | 1. PROVIDE A REVISED GRADING PLAN THAT SHOWS ALL REVISIONS TO THE A.D.A. TRAIL. THE PLAN MUST BE STAMPED AND APPROVED BY THE C.O.T. ENGINEERING AND ZONING DIVISIONS. 2. PROVIDE A LETTER FROM THE ARIZONA REGISTERED P.E. THAT CERTIFIES THAT THE LINE AND GRADE OF THE A.D.A. TRAIL IS IN CONFORMANCE WITH THE APPROVED PLAN. 3. PROVIDE COPIES OF THE COMPACTION TESTS FOR THE A.D.A. TRAIL. NOTE: THE NON-CITY APPROVED PLAN WAS STAMPED AND DATED BY JIM STANLEY P.E. ON 5/30/07. |
|
08/14/2007 | GRADING - INTERMEDIATE | Correction Required | INSPECTION CONDUCTED WITH PAUL MACHADO THE PLAN REVIEW ENGINEER FOR THIS PROJECT. 1. PROVIDE PLANS AND SPECIFICATIONS FOR ALLEN BLOCK RETAINING WALLS. 2. PROVIDE A CORRECTIVE ACTION PLAN THAT DETAILS HOW THE FAILURES OF THE RETAINING WALLS WILL BE CORRECTED. 3. THE ENGINEER OF RECORD MUST MEET WITH PAUL MACHADO AND LEE RAY HANLEY TO ADDRESS THE RETAINING WALL CONSTRUCTION. 4. PROVIDE A REVISED GRADING PLAN TO THE CITY OF TUCSON ENGINEERING DIVISION FOR REVIEW AND APPROVAL OF ALL MODIFICATIONS TO THE GRADING PLANS FOR: ELEVATIONS. DRAINAGE STRUCTURES AND ROCK CHANNELS. |
|
03/14/2007 | GRADING - INTERMEDIATE | Partial Approval | MET WITH LUIS VASQUEZ AND LES COOPER ON SITE INTRODUCED JOHN B AS NEW INSPECTOR DISCUSSED PEDESTRIAN PATH/TRAIL-NO STEEPER THAN 1:12 8% SWEEPING TO BE DONE BY SUNSTATE SWEEPING |
|
01/04/2007 | GRADING - INTERMEDIATE | Partial Approval | DRY UTILITIES BEING INSTALLED RETAINING WALLS STILL BEING INSTALLED |
|
10/27/2006 | GRADING - INTERMEDIATE | Partial Approval | TALKED TO LUIS WITH EAGLE ROCK RETAINING WALLS ARE INTERLOCKING BLOCK |
|
10/25/2006 | GRADING - INTERMEDIATE | Partial Approval | GRADING REVISION SIGNED BY PAUL 10/12/06 |