Inspection History Details
Permit: T04BU01206
Inspection Status: Correction Required
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2011 | GRADING - INTERMEDIATE | Correction Required | Inspection request for today, no one onsite, no approved plans onsite, need a contact phone number to call in the future for inspections. | |
| 05/08/2008 | GRADING - INTERMEDIATE | Correction Required | MET ONSITE WITH PATRICK BID WENT OUT FOR BASIN WORK |
|
| 09/13/2007 | GRADING - INTERMEDIATE | Correction Required | NO ADDITIONAL WORK HAS BEEN DONE AT THE WEIR LOCATION KB WORK CP BY DESERT EARTH ON DRAINAGEWAY-SCOUR PREVENTION WORK ON CDP SIDE NOT STARTED |
|
| 07/23/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS FROM TODAY STANDING WATER DRAINAGEWAY HAS FAILED IN THE SAME LOCATION AS LAST YEAR NO REPAIRS HAVE BEEN MADE TO PREVENT THE SAME FAILURE AS LAST YEAR HABITAT FOR HUMANITY HAS DONE THEIR REPAIRS LANDMARD AND WLB'S WORK NOT COMPLETED FOR KB AND CANTERBURY |
|
| 07/11/2007 | GRADING - INTERMEDIATE | Continued | BASINS ARE WET BUT NO STANDING WATER | |
| 06/27/2007 | GRADING - INTERMEDIATE | Correction Required | NO ADDL WORK DONE ON DRAINAGE | |
| 01/04/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 1905-1908 STANDING WATER-EVIDENCE OF STANDING WATER 7 DAYS AFTER LAST RAIN EVENT 12/27-12/28 |
|
| 11/13/2006 | GRADING - INTERMEDIATE | Correction Required | MET ON SITE WITH MIKE SMITH WLB AND ELIZABETH E. CROSS SECTION TO BE PROVIDED BY WLB TO ELIZBETH FOR SE CORNER OF PROJECT SHOWING NEW DESIGN BRINGING WATER TO SE BASIN ELIZABETH REMINDED MIKE SMITH THAT A POST CONSTRUCTION PERC TEST WILL BE REQUIRED |
|
| 10/18/2006 | GRADING - INTERMEDIATE | Correction Required | MET WITH MIKE SMITH AND ELIZABETH E RE: CHANGES TO SITE FOR DRAINAGE IN CONJUNCTION WITH LANDMARK FOR JULIAN RANCH | |
| 08/18/2006 | GRADING - INTERMEDIATE | Correction Required | MEETING AT 201 N STONE-CALLED BY ELIZABETH DAVID LITTLE WLB PRESENT Bruce Wilson EEC HABITAT FOR HUMANITY PHILIP AND DANNY KNEE GRANITE FRANK LOZANO ADDITIONAL WORK TO BE DONE TO ADDRESS ACCEPTANCE OF FLOW FROM EAST SIDE OF PROJECT AND RELEASE OF THOSE WATERS |
|
| 06/08/2006 | GRADING - INTERMEDIATE | Correction Required | BASINS ARE HOLDING WATER MET WITH MO AND WLB ONSITE-REVISIONS FORTHCOMING FOR AN INCORRECT WIER STRUCTURE ALSO |