Inspection History Details
Permit: T04BU01206
Inspection Status: Denied
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2011 | STORMWATER FOLLOW-UP INSP | Denied | Inspection request for today, no one onsite, no approved plans onsite, need a contact phone number to call in the future for inspections. | |
| 08/24/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SANTA RITA LANDSCAPING ON SITE CLEANING UP WEEDS AND INSTALLING IRRIGATION/PLANTS | |
| 07/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 2 DAYS FAXED AND SENT VIA REGULAR MAIL LEFT MESSAGE FOR DANNY KNEES PUMP OUT STANDING WATER IN BASINS PERFORM MAINTENANCE ON ALL SEDIMENT CONTROLS SWEEP STREETS |
|
| 07/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SMALL AMOUNTS OF STANDING WATER IN BASINS | |
| 01/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | DEBRIS IN BASINS NEEDS TO BE CLEANED UP SEDIMENT CONTROLS NEED TO BE MAINTAINED |
|
| 01/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | HABITAT FOR HUMANITY MET WITH LANCE OSBORNE 661-6379 OT LANDSCAPING RE CURBSIDE BMPS AND SWPPP MAINT |
|
| 12/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE 10 DAYS -CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS LOT 125 -SWEEP IN FRONT OF ALL ACTIVE LOTS -LOT 108-CONCRETE WASHOUT- WHO'S IS IT? |
|
| 12/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN HOMES CORRECTION NOTICE 10 DAYS -SWEEP AT ALL ACTIVE LOTS -LOT 108-CONCRETE WASHOUT-WHO'S IS IT? |
|
| 12/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE 10 DAYS -CLEAN OUT ALL SCUPPER INLETS -REMOVE ALL TRASH AND DEBRIS FROM DRAINAGEWAYS -SWEEP ROADWAYS-TRACK OUT IN SE PART OF PROJECT (GRANITE?) -LOT 108 CONCRETE WASHOUT-WHO'S IS IT? |
|
| 12/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY TALKED WITH DANNY KNEE OT LANDSCAPING HAS BEEN HIRED TO DO CURBSIDE BMPS CONTACT IS LANCE 661-6379 |
|
| 12/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TALKED TO STEVE SLEIGHT WITH EARTH WORKERS RE SILT FENCE REQMTS FAXING OVER A DRAWING FROM STANTEC WITH SPECS |
|
| 11/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE ISSUED 7 DAY -LOT 25 CLEAN UP DIRT FROM STREET (PROTECT STOCK PILE) -LOT 11 CLEAN UP CONCRETE WASH OUT (PLACE CONTROLS AT STOCKPILE) -LOT 10 CLEAN UP STUCCO WASHOUT -LOT 8 PLACE CURBSIDE BMP (PROTECT STOCKPILE) -LOT 1 PLACE CURBSIDE BMP (LOT 3 STOCKPILE) -LOT 73 UNCONTAINED CONSTRUCTION DEBRIS -LOT 67-74 CURBSIDE BMPS AND SWEEP -LOT 260-261 CURBSIDE BMPS AND SWEEP -LOT 178 CURBSIDE BMPS AND SWEEP |
|
| 11/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE 7 DAYS -LOT 268 SWEEP STREET (PROTECT STOCKPILE) -LOT 267 UNCONTAINED CONSTRUCTION DEBRIS -PLACE CURBSIDE BMPS (ALL ACTIVE LOTS) -LOT 259 SWEEP STREET -PROTECT DRAINAGEWAY BEHIND WASHOUT |
|
| 11/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE 7 DAY -LOT 98 CURBSIDE BMPS -LOT 79 SWEEP STREET |
|
| 11/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN CORRECTION NOTICE 7 DAYS -LOT 21 RE-ESTABLISH CURBSIDE BMP -LOT 53/54 PLACE CURBSIDE BMP -LOT 205-208 SWEEP STREET WHERE SCE HAVE BEEN REMOVED |
|
| 11/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE 7 DAYS -WEST END OF CMO D L HUMANIDAD CLEAN UP CONCRETE WASHOUT IN STREET -WEST END OF CMO D L HUMANIDAD CLEAN/MAINTAIN CONTROLS AT SCUPPER -SOUTH OF CMO D L HUMANIDA/CL D L APERTURA CLEAN/MAINTAIN CONTROLS AT SCUPPER |
|
| 10/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN TALKED WITH CRAIG DAWSON ON SITE CORRECTION NOTICE ISSUED 7 DAYS -LOT 366 CLEAN UP CONC WASHOUT ON LOT -LOT 366 CLEAN UP SPOILS FROM WALL-SWEEP -LOT 347 REMOVE DIRT FROM STREET AND SWEEP LOT 53, LOTS 289-294 -SWEEP TRACK OUT AT CONCRETE WASHOUT |
|
| 10/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE ISSUED 7 DAYS -SWEEP CL DE HIELO DULCE AND LOTS 67-74 -RE-ESTABLISH CURBSIDE BMPS LOTS 12-14, 8-11, 369-371, 67-74, 130-131, 260-262 -SIGN CONCRETE WASHOUT -CONTAIN CONSTRUCTION DEBRIS LOT 363 AND 100 |
|
| 10/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE ISSUED 7 DAYS -RE-ESTABLISH CURBSIDE BMPS LOT 79-81, 98 -SWEEP ROADWAY LOTS 79-81 |
|
| 10/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT TALKED TO JUSTIN-CONCRETE WASHOUT DID NOT HOLD WITH RAINS RECEIVED. WORKERS ARE GOING TO CLEAN UP OVER TOPPING/BERM BREAK |
|
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE ISSUED 7 DAYS -LOT 51 REPAIR/REPLACE/RESET SEDIMENT CONTROLS AND SWEEP -LOT 51 NO MORE UNCONTAINED DRYWALL WASHOUT -LOT 91 WEST SIDE SWEEP FROM SIDEWALK EXCAVATION |
|
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE 7 DAYS -LOT 356/357 MOVE PORTA TOILET OUT OF ROW -MAINTAIN CONTROLS AT LOT 356/357 SWEEP ALSO -LOT 84/85 PLACE CONTROLS AND SWEEP -SWEEP CMO DE AZAR -SWEEP AT CONCRETE WASH OUT -LOT 265 PLACE CONTROLS-PROTECT DRAINAGEWAY -LOT 268 SWEEP AND PLACE CONTROLS -LOT 278 PLACE CONTROLS AND SWEEP -LOT 276, 273-288 PLACE CONTROLS -LOT 284 UNCONTAINED DRYWALL WASH OUT BY ARTISTIC DRYWALL-OBSERVED |
|
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE 7 DAYS -LOT 27 TRACK OUT -LOTS 12/13/14 PROVIDE SEDIMENT CONTROLS AT CURB -WASHOUT EAST OF LOT 14 FULL-NEEDS A SIGN ALSO -LOT 364 REBAR IN STREET, NEEDS CONTROLS, SWEEP -LOT 100 CLEAN UP PAINT WASH OUT -LOT 269 PLACE CONTROLS AT DRAINAGEWAY AND SWEEP |
|
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE 7 DAYS -LOT 107 SWEEP -LOT 91 SWEEP -LOT 97 PLACE CONTROLS-CLEAN UP DEBRIS -LOT 82 PLACE CONTROLS AT STOCKPILE -LOT 79 RESET WATTLES CEMEX DRIVER WAS OBSERVED WASHING OUT ON AN EMPTY LOT AFTER CONCRETE POUR FOR DOUCETTE (DRIVEWAY/SIDEWALK). ADVISE TO USE WASHOUT NEXT TO LOT 14-DRIVER COMPLIED |
|
| 09/22/2006 | STORMWATER FOLLOW-UP INSP | Approved | STANDING WATER IN BASINS ALREADY DOCUMENTED LEFT MESSAGE FOR PATRICK |
|
| 09/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE 10 DAYS -AZPDES NEEDS TO BE POSTED ON SITE WITH SWPPP -STANDING WATER IN BASINS NEEDS TO BE ADDRESSED -SEDIMENT IN ROADWAY AT SCUPPERS NEEDS TO BE REMOVED -INSPECT/REPAIR ALL SEDIMENT CONTROLS -REMOVE ALL DEBRIS FROM ALL BASINS/COMMON AREAS |
|
| 09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE 7 DAYS -PLACE CURBSIDE BMPS AT LOT 125 |
|
| 09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE 7 DAYS -CLEAN UP CONSTRUCTION DEBRIS FROM LOT 6/7 ON LOT 5 -CLEAN UP ALL WASH OUT LOTS 274-288 -CONTINUE MAINTENANCE OF ALL SEDIMENT CONTROLS |
|
| 09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE ISSUED 7 DAYS -LOT 17 CLEAN UP STUCCO WASH OUT ON W SIDE OF HOUSE -LOT 17 CLEAN UP STUCCO IN ROADWAY -LOT 14 CLEAN UP WASH OUT ON WEST SIDE OF LOT -LOT 5 CONSTRUCTION DEBRIS (AMERICA BUILT NOTIFIED) |
|
| 09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE 10 DAYS -LOT 98, 97 STUCCO/DRYWALL WASHED OUT- NO CURBSIDE CONTROLS -LOT 94 STOCKPILE OF CONSTRUCTION/STUCCO DEBRIS -LOT 65 STUCCO WASHED OUT -LOT 56-58 SWEEP STREET FROM EXCAVATOR TRACK OUT |
|
| 09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE ISSUED 10 DAYS -LOT 278 DEBRIS AROUND DUMPSTER/NEED CONTROLS -LOT 274 DRYWALL WASHED OUT IN STREET -LOT 287 DRYWALL WASHED OUT IN STREET -LOT 78 RESET WATTLES CLEAN UP TRACK OUT -LOT 85 DUMPSTER OVERFULL/OVERFLOWING -LOT 85 STUCCO WASHED OUT |
|
| 09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE 10 DAYS -CONSTRUCTION DEBRIS ON LOT 77 -TRACK OUT FROM STOCKPILE LOT 77 -SWEEP STREETS -REMOVE DEBRIS FROM ALL COMMON AREAS, DRAINAGEWAYS AND BASINS |
|
| 08/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | CURSORY INSPECTION BEFORE WEEKLY 8/31 SITE IN BETTER SHAPE SOME CONTROLS NEED TO BE ADDRESSED AND DEBRIS ONSITE WILL ADDRESS BUILDER BY BUILDER NEXT INSPECTION |
|
| 08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY PICS 1159-1163 NO WORK HAS BEEN STARTED TO ADDRESS NOV ISSUED RECVD EMAIL FROM PATRICK TO GIVE SCHEDULE Nichole: The streets will all be swept tomorrow. The sediment control devices and trash/debris in basins, sidewalk forms and common areas will be worked on Monday the 28th. The bank behind lots along Camino Hermanidad that were excavated for sidewalks is currently painted out for the retaining wall to be installed by the builder that owns those lots. I will try to get a better schedule for this later in the week. The stabilization of the undeveloped lots is still being coordinated and I will follow-up with you by the end of the week. Thank you for working with us to get this project in compliance.........Patrick |
|
| 08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN CORRECTION NOTICE ISSUED 7 DAYS -LOT 52 CLEAN UP TRACK OUT -SWEEP IN FRONT OF ALL ACTIVE LOTS |
|
| 08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE 7 DAYS -PLACE CURBSIDE BMPS AT ALL ACTIVE LOTS -SWEEP IN FRONT OF ALL ACTIVE LOTS |
|
| 08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE ISSUED 7 DAYS -LOT 88 SWEEP UP DIRT WASHED INTO STREET -LOT 89 RESET WATTLE LOT 59 -BMP AT CURBSIDE FOR ALL ACTIVE LOTS -SWEEP IN FRONT OF ACTIVE LOTS -LOT 107 SWEEP |
|
| 08/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE 7 DAYS -SWEEP EAST OF LOT 23 AT H/C RAMP (LANDSCAPE CLEAN UP) -PLACE CURBSIDE BMPS ALL ACTIVE LOTS -SWEEP IN FRON OF ALL ACTIVE LOTS |
|
| 08/21/2006 | STORMWATER FOLLOW-UP INSP | Continued | MET ONSITE WITH BRETT AND JUSTIN...STILL ISSUES RE INSPECT FOR AM BUILT AND HABITAT FOR HUMANITY 8/22 ALL OTHER BUILDERS 8/24 |
|
| 08/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PPW-CERT MAIL SENT BY KRISTINA | |
| 08/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PPW HAND DELIVERY | |
| 08/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PPW HAND DELIVERY | |
| 08/18/2006 | STORMWATER FOLLOW-UP INSP | Approved | PPW HAND DELIVERY | |
| 08/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY NOTICE OF VIOLATION ORDINANCE #10209 26-40.3,5,6,8 5 DAYS FOR COMPLIANCE FAILURE TO ADDRESS ITEMS FROM 8/10 INSPECTION NOT IN COMPLIANCE WITH STORMWATER ORDINANCE OR SWPPP CORRECTION NOTICE: -REMOVE GARBAGE/DEBRIS FROM ALL DRAINAGEWAYS/BASINS -RESET/MAINTAIN ALL SWPPP CONTROLS IN DRAINAGEWAYS/BASINS -CLEAN UP TRACK OUT LOT 30/319 SWEEP STREET -PLACE CURBSIDE BMPS 334-337 -SWEEP STREETS 334-337 PICS 1088-1095, 1112-1113 |
|
| 08/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT NOTICE OF VIOLATION ORDINANCE #10209 26-40.3,5,6,8 5 DAYS FOR COMPLIANCE FAILURE TO ADDRESS ITEMS FROM 8/10 INSPECTION NOT IN COMPLIANCE WITH STORMWATER ORDINANCE OR SWPPP CORRECTION NOTICE 5 DAYS FOR COMPLIANCE -LOT 23/24 SWEEP STREETS 6, 7, 85, 86, 83, 79, 324, 315, 265-268, 269-288 -PLACE CURBSIDE BMPS LOTS 6, 7, 83, 79, 288-269, 265-268 -CLEAN UP TRACK OUT FROM LOT 6 TO CALLE DE LA APERATURA -CLEAN UP STUCCO WASHOUT ON LOT 94 (USED FOR LOT 85/86) -PROTECT BASIN WITH SEDIMENT CONTROLS LOT 79,76, 273-269 -RESET SEDIMENT CONTROLS LOT 79 -REMOVE WASH OUT LOT 76 -CLEAN UP CONSTRUCTION DEBRIS EAST OF LOT 306 -REMOVE DUMPSTER FROM ROW LOT 324 -CLEAN UP TRACK OUT FROM LOT 279 TO CAMINO AZUCAR -PLACE STABILIZED CONST ENTRANCE AT WASH OUT -SWEEP CMO DEL AGUA PICS 1110,1109,1104,1103 |
|
| 08/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE CORRECTION NOTICE -SWEEP LOTS 56-59, 87-90, 60-66, 107-103, 91-93, 84, 94-97, 81, 80 -PLACE CURBSIDE BMPS 56-59, 91, 93, 84, 94-98, 81 -CLEAN UP WASHED OUT CONCRETE IN ROAD LOT 81, 98 -USE WASH OUT FOR STUCCO LOT 97 -CLEAN UP LANDSCAPING LOT 298 (2ND NOTICE) |
|
| 08/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE RICHMOND AM -19-21 STOCKPILES/GARBAGE -CLEAN UP TRACK OUT LOT 52-55, 332 -CLEAN UP DEBRIS IN ROW LOT 331 -REMOVE DIRT FROM ROW/PARKING LOT LOT 333 SWEEP -STOCK PILES 289-294 -SWEEP IN FRONT OF LOTS 289-294 PIC 1098 |
|
| 08/17/2006 | STORMWATER FOLLOW-UP INSP | Approved | CORRECTION NOTICE TJ BEDNAR - LOT 25/26 CONCRETE WASHED OUT -LOT 25/26 NO DUMPSTER -LOT 25/26 PORTA TOILET KNOCKED OVER -LOT 26 STOCK PILE NOT PROTECTED -PLACE CURBSIDE BMPS LOT 22, 25-29, 9-11 -REMOVE DEBRIS LOT 29 SWEEP IN FRONT OF LOTS 9-11 -REMOVE BLOCK AND OTHER DEBRIS FROM ROW LOT 314 |
|
| 08/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE IS GETTING BETTER MET WITH GRANITE (FRANK LOZANO AND MO PARTON) SWEEPER ON SITE-LABORER TO FINISH CLEAN UP AT SCUPPERS WHERE BASINS OVER TOPPED AND DEPOSITED SEDIMENT ON ROADWAY -MET WITH JASON SALINE ON SITE (PH 3) STOCKPILES TO BE ADDRESSED-SEDIMENT TRENCH ALREADY INSTALLED AT RICHMOND AM LOTS -MET WITH MARK (TJ BEDNAR) ON SITE-LABORERS SWEEPING CONTROLS STILL BEING PLACED |
|
| 08/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HAND DELIVERED CORRECTION NOTICES TO TJ BEDNAR, AMERICA BUILT AND DOUCETTE | |
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE TO TJ BEDNAR 7 DAYS -LOT 100 DIRT/SEDIMENT ON ROADWAY -LOT 101/102 REMOVE SEDIMENT FROM STREET AND SWEEP -PLACE SEDIMENT CONTROLS AT ALL LOTS -STUCCO WASHED OUT AT LOT 30 -NO SEDIMENT CONTROLS LOT 18 -MORTAR WASHED OUT AT REAR OF LOTS 16 AND 17 |
|
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE TO AMERICA BUILT 7 DAYS -DEBRIS NOT IN DUMPSTER LOT 273/283/75/76/86/6/23 -NO SEDIMENT CONTROLS LOT 269-288/75/76/86/6 -REMOVE SEDIMENT FROM STREET AND SWEEP (ALL LOTS) -STUCCO SPILLED IN STREET LOT 86 -ALL LOTS NOT BEING WORKED WITHIN 14 DAYS ARE TO BE STABILIZED |
|
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED TO HABITAT FOR HUMANITY 7 DAYS -MAINTAIN SEDIMENT CONTROLS -CLEAN UP ALL SIDEWALK EXCAVATION WORK -MAINTAIN SWPPP COMPLIANCE (STREET SWEEPING) -LOTS 319-321 NO SEDIMENT CONTROLS AT STOCK PILES -ADDRESS SLOPE STABILIZATION REAR LOTS 387-390 -CLEAN UP DEBRIS IN SIDEWALK FORMS -ALL LOTS NOT BEING WORKED FOR 14 DAYS OR MORE ARE TO BE STABILIZED |
|
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED TO DOUCETTE 14 DAYS -LOT 125 SWEEP STREET/PLACE CONTROLS -RESET SEDIMENT CONTROLS LOT 84 -CONTINUE WITH STREET SWEEPING -ALL LOTS NOT WORKED FOR 14+ DAYS ARE TO BE STABILIZED |
|
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED TO RICHMOND AMERICAN 7 DAYS -NO SEDIMENT CONTROLS BEHIND CURB LOT 347-352 -LOT 53-54 STOCKPILES NOT PROTECTED -LOT 53-54 SEDIMENT IN STREET -ALL LOTS NOT BEING WORKED FOR 14+ DAYS ARE TO BE STABILIZED |
|
| 08/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE TO DANNY KNEE W/ HABITAT FOR HUMANITY ABOUT NON RESPONSE FROM PATRICK TO INSPECTION REPORTS. PATRICK CALLED AFTER 4 AND ADVISED HE HAD FOUND THE REPORTS. ON SITE MEET AT 9 AM 8/10 WITH PATRICK AM BUILT INSTALLING CONC WASHOUT |
|
| 08/08/2006 | STORMWATER FOLLOW-UP INSP | Approved | ESCALANTE CONCRETE WASHED OUT IN ROADWAY (AM BUILT) SUPERVISOR FOR CPC SOUTHWEST MATERIALS ON SITE PHASE 3-LOTS NOT STABILIZED LEFT MESSAGE FOR (HFH) PHASE 2-CALLED EARTHWORKERS TO CLEAN UP IN FRONT OF DOUCETTE HOME SITES |
|
| 08/07/2006 | STORMWATER FOLLOW-UP INSP | Approved | HAND DELIVERED CORRECTION NOTICES TO: TJ BEDNAR, AMERICA BUILT, DOUCETTE MAILED CORRECTION NOTICES TO: RICHMOND AMERICAN AND HABITAT FOR HUMANITY |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY LOT 24 DEBRIS, STOCKPILE, WASHOUT AND EROSION -PLACE SEDIMENT CONTROLS BEHIND CURB -LOT 4 STOCKPILES (DEBRIS) NOT PROTECTED -LOT 77 ERODED INTO STREET -SWEEP STREETS -STABILIZE/CUT BACK DIRT EAST SIDE OF SIDEWALK LOTS 383-393 |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT -LOT 6/7 CLEAN UP SEDIMENT OVER CURB -PLACE SEDIMENT CONTROLS (ALL LOTS) -LOT 76 DEBRIS AROUND HOUSE AND INTO DRAINAGE -WASHED OUT STUCCO LOT 76 -LOT 288-284 WASH OUT, DEBRIS, STOCKPILE ALL NOT CONTAINED -TRACK OUT NEEDS TO BE SWEPT LOTS 272-288 |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AM -LOT 53 HAS ERODED INTO THE STREET -STOCKPILED ROCK NO CONTROLS -PLACE SEDIMENT CONTROLS BEHIND CURB UNTIL LOTS ARE STABILIZED |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUCETTE HOWARD MEYERS HAS BEEN HIRED AS SWPPP CONSULTANT -LOT 35 CLEAN UP SEDIMENT OVER CURB -PLACE SEDIMENT CONTROLS UNTIL LOTS ARE STABLE -LOT 87 MASONS NOT USING PLASTIC (ETC) AT MIXER -LOTS 56-59 NO DUMPSTER, CONST DEBRIS NOT CONTAINED -LOT 89 STOCKPILED SAND NO CONTROLS -LOTS 98-96 TRACK OUT FROM FOUNDATION WORK (SWEEP UP) -LOTS 97-96 STOCKPILES NO SEDIMENT CONTROLS -LOTS 66-60 SWEEP UP TRACK OUT |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR TALKED TO KEVIN FITZSIMMON ON THE PHONE TALKED TO DALE AND MARK ON SITE -LOT 30 STUCCO CONTRACTORS NOT USING POOL/PLASTIC -CALLE DE HIELO DULCE NEEDS TO BE SWEPT -CONST DEBRIS BETWEEN LOT 30 AND 31 NOT CONTAINED -CONCRETE NEXT TO DUMPSTER ON LOT 29 -STOCKPILE ON LOTS 29 AND 8 NOT PROTECTED -DUMPSTER FULL/OVER FLOWING LOT 17 -CONCRETE LOT 16 NEEDS TO BE CLEANED UP -STOCKPILE LOT 16 NOT PROTECTED -LOT 25-26 STOCKPILE, DEBRIS, WASHOUT -PLACE SEDIMENT CONTROLS BEHIND CURB -LOT 99-100 STUCCO/DRYWALL WASHED OUT IN DRIVEWAY |
|
| 07/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PAPERWORK TO 7 BUILDERS/CONTRACTOR RICH AM AND HFH WERE MAILED ALL OTHERS HAND DELIVERED |
|
| 07/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE PICS 602-632 MULTIPLE SWPPP ISSUES FOR ALL BUILDERS AND GRADING CONTRACTOR |
|
| 07/25/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH BRETT W/ DOUCETTE ON SITE SITE LOOKS BETTER-STILL NEEDS SWEEPING MORE BMPS IN PLACE |
|
| 07/12/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CALLED AND LEFT MESSAGE FOR ALISSA AT AM BUILT STOCK PILE HAULING HAS CREATED ISSUES FOR CORAZON DEL PUEBLO |
|
| 07/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | -MET BRETT WITH DOUCETTE -CPC DRIVER KNEW WHERE TO WASH OUT (WORKING FOR SAGUARO SPECIALTIES) -RINKER DRIVER ADVISED HE WOULD WASH OUT IN HIS BUCKET -OCOTILLO CONCRETE IS DOING SIDEWALK WORK FOR HABITAT FOR HUMANITY |
|
| 06/30/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE IN POOR CONDITION PICS 424-447 TRACK OUT, STANDING WATER, WASH OUT ALL THROUGHOUT THE SITE THERE IS NO CONCRETE WASHOUT FOR ANY BUILDER ON SITE LETTER TO BE SENT TO:TJ BEDNAR, AMERICA BUILT, RICHMOND AMERICA, HABITAT FOR HUMANITY, DOUCETTE, DUCATI. |
|
| 06/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME SITE IN GOOD SHAPE |
|
| 06/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE CONTINUES TO BUILD NO STORMWATER CONCERNS AT THIS TIME-NO STANDING WATER AFTER LAST NIGHT'S RAIN |
|
| 05/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MO-NOI IS NOT POSTED DUE TO VANDALISM | |
| 05/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | PLACE SEDIMENT CONTROLS AT OUTLET/INLET OF RCP AT NW CORNER OF PROJECT CONTINUE WITH SWEEPING SCHEDULE |
|
| 04/07/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PLACE SEDIMENT CONTROLS AT VAN BUREN AND CMO DE LA HUMANIDAD SCUPPER INLET SWEEP TRACK OUT AT CMO DE LA HUMANIDAD AND CL DE JUSTICIA BE SURE TO PLACE SEDIMENT CONTROLS AT ALL INLETS TO DRAINAGE/RET/DET STRUCTURES SITE NEEDS TO BE SWEPT WHERE TRADES ARE WORKING |
|
| 03/21/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PLACE SEDIMENT CONTROLS AT VAN BUREN AND CMO DE LA HUMANIDAD SCUPPER INLET SWEEP TRACK OUT AT CMO DE LA HUMANIDAD AND CL DE JUSTICIA BE SURE TO PLACE SEDIMENT CONTROLS AT ALL INLETS TO DRAINAGE/RET/DET STRUCTURES |
|
| 03/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MO FROM GRANITE SITE IN GOOD CONDITION PHASE 2 IS INSTALLING UTILITIES PH 1 IS PAVED |
|
| 03/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SCE IN PLACE SOME PAVING COMPLETE ON NORTH END OF SUBDIVISION GRANITE IS KEEPING UP ON SWEEPING |
|
| 09/16/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH WILL HILLICKSON. REQUESTED THAT BASIN AT S/W CORNER OF SITE THAT IS RETAINING WATER BE TAKEN CARE OF. NECESSARY REPAIRS SHOULD BE COMPLETED BY EARLY NEXT WEEK. | |
| 08/02/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH WILL HILLICKSON. ASKED FOR CONSTUCTION ENTRANCES AT MCKINLEY AND VAN BUREN AND ALSO AT ELVIRA TO BE CLEANED UP AND RESTABALIZED. | |
| 06/06/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | A basic inspection was performed on this site. Progress is being made for sewer installation at this time. Rough cut for roads and basins only at this time. Silt-fencing has some needed repairs and contractor will be informed of the corrections and asked for a re-inspection. | |
| 03/04/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO OTHER STORM WATER CONCERNS ON THIS SITE AT THIS TIME. |