Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2004 | ENGINEERING PRE-CONSTRUCTION | Approved | PRE-CON MEETING WITH KEN FRENCH (413-246-6019) THE SUPERINTENDENT FOR NEWGROUND. SOIL SYSTEMS IS THE GRADING CONTRACTOR. 1. PROVIDE A SIGN AT THE SITE ENTRANCE WITH: A. AZPDES AUTHORIZATION, OR NOI. B. SITE CONTACT NAME AND PHONE NUMBER. C. BRIEF DESCRIPTION OF THE PROJECT D. LOCATION OF THE SWPPP 2. INSTALL SWPPP SEDIMENT AND EROSION CONTROLS 3. CALL FOR INSPECTION #09152 INSTALLATION OF CONTROLS. |
|
| 07/19/2004 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | Not ready for inspection. No work has begun. |