Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU01059
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/20/2008 | GRADING - FINAL | Approved | ||
05/15/2008 | GRADING - FINAL | Partial Approval | RESEED DRAINAGE SWALE NORTH OF LOT #50 AND COMMON AREA NORTH OF LOTS 48-49 STABILIZE SOIL AS NEEDED. | |
11/29/2007 | GRADING - FINAL | Denied | 1. PROVIDE A LETTER OF CERTIFICATION FROM THE ARIZONA P.E. THAT CERTIFIES THAT THIS PROJECT, THE DRAINAGEWAYS AND THE RETENTION/DETENTION BASINS WERE CONSTRUCTED TO THE APPROVED PLANS AND WILL FUNCTION AS DESIGNED. PROVIDE EXPLANATION FOR THE OMMISION OF THE WATER HARVESTING ON THE LOTS AS SHOWN IN DETAIL G ON PAGE 9 OF THE GRADING PLAN. 2. RETENTION/DETENTION BASINS REQUIRE LANDSCAPE MAINTENANCE TO CLEAN UP EXCESS SOIL, SEDIMENT AND TO FILL IN LOW AREAS. 3. CONSTRUCT DRAINAGE SWALE NORTH OF LOT #50 TO PLAN SPECIFICATIONS. SEE DETAIL Q, PAGE 11. 4. DRESS UP COMMON AREA NORTH OF LOTS 48-49 STABILIZE SOIL AS NEEDED. 5. DRESS UP AREA WEST OF LOTS 18-21. 6. REMOVE ALL SWPPP BMP'S WHERE NO LONGER NEEDED. 7. REMOVE SEDIMENT FROM CATCH BASINS. |