Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04BU01059


Addresses:

10411 E BILBY RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU01059

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
11/28/2007 STORMWATER FOLLOW-UP INSP Approved
02/07/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-SWEEP VALLEY QUAIL ESPECIALLY AT HYDRANT AND NEW CONSTRUCTION
-SWEEP TRACK OUT AT N END OF STARLING
-PLACE S.C.E. AT NURSERY/CONSTRUCTION ENTRANCE
-SWEEP PAINTED TURTLE-TRACK OUT EAST SIDE OF NURSERY
-CLEAN UP DEBRIS AT N END OF SWAYING PALMS
-PERFORM MAINTENANCE ON SEDIMENT CONTROLS E END OF PAINTED TURTLE
12/28/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
PICS 1892-1897 AND CIVANO II 12-28-06
-TRACK OUT AT SALES OFFICE
-NO SCE OR SCE NEEDS MAINTENANCE AT SALES OFFICE
-DIRT RAMP/DEBRIS IN ROADWAY AT NURSERY
-DEBRIS IN DRAINAGEWAY
-UNPROTECTED SCUPPER INLETS
10/17/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS

-SWEEP STREET VALLEY QUAIL AT NEW CONSTRUCTION
-SWEEP TRACK OUT STARLING/PAINTED TURTLE
-SWEEP TRACK OUT NORTH OF 10370 PAINTED TURTLE AT NURSERY
10/03/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS
-SWEEP COURTLAND NORTH OF CIVANO II BLK 2
-REMOVE DEBRIS NORTH OF WALL LOTS 1-4
-FIX WATER LEAK AT WATER METER WEST OF SALES OFFICE (LOT 1)
-SWEEP AT NURSERY AND BY SALES OFFICE AND NORTH END OF SWAYING PALMS
-MAINTAIN GRAVEL FILTER BAGS AT ALL PARK SCUPPERS
08/29/2006 STORMWATER FOLLOW-UP INSP Approved CORRECTION NOTICE ISSUED 5 DAYS PICS 1186-1194
-CONTAIN ALL CONSTRUCTION DEBRIS
-SWEEP UP ALL TRACK OUT
-REMOVE TRACK OUT ROCK FROM R.O.W.
-MAINTAIN SEDIMENT CONTROLS AT ALL SCUPPERS
08/16/2006 STORMWATER FOLLOW-UP INSP Correction Required SWEEP TRACK OUT ON COURTLAND
SWEEP TRACK OUT ON VALLEY QUAIL
RE-SET GRAVEL FILTER BAGS CAPERCALLIE
RE-SET GRAVEL FILTER BAGS AT SCUPPER COURTLAND
08/02/2006 STORMWATER FOLLOW-UP INSP Correction Required STANDING WATER SOUTH OF LACEBARK (EAST END)
SILT AND SEDIMENT IN PARK AREA PICS 829-830
07/28/2006 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO KEON WITH PULTE

RE INSPECT FOR TUESDAY AUG 1

ITEMS WERE TO HAVE BEEN ADDRESSED
07/25/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. SPILL AT EAST END OF PAINTED TURTLE
2. RESET FILTER BAGS AT SCUPPER (STARLING AND PAINTED TURTLE)
3. SWEEP ROCK FROM STABILIZED CONSTRUTION ENTRANCE BY JOB TRAILER
4. STOP LEAK AT WATER METER AT SALES/JOB OFFICES
07/12/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. SWEEP VALLEY QUAIL
2. REPLACE GRAVEL FILTERBAG AT SCUPPER WEST END OF PAINTED TURTLE LN
3. SWEEP AT S.C.E. FOR NURSERY
4. SWEEP EAST END OF CAPERCALLIE (OIL SPILL?)
5. REPLACE GRAVEL FILTER BAG AT SCUPPER TO PARK AREA ON CAPERCALLIE
6. ADDRESS EROSION AT STEPS/WALKWAY TO COMMON AREA ON VALLEY QUAIL AND AT LACEBARK
06/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval ONGOING ISSUES WITH NURSERY AREA

SITE IN GENERALLY OKAY SHAPE
05/23/2006 STORMWATER FOLLOW-UP INSP Correction Required -SITE NEEDS TO BE SWEPT (ESPECIALLY AT H2O METER LOCATION FOR CIVANO II BLK 2 AND AT NURSERY)
-CONCRETE WASH OUT NEEDS TO BE SIGNED N OF SALES OFFICE
05/17/2006 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT ON SITE FROM DT TREE USING KLEIN TANK TO FILL WATER TRUCK FROM SIERRA MORADO JOB
05/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval -CONTINUE TO PLACE/USE BMP'S AROUND LANDSCAPING AREAS AND MATERIALS
-CONTINUE TO MAINTAIN/PLACE AS NECESSARY SEDIMENT/EROSION CONTROLS ALONG EAST SIDE OF PROJECT
-CONTINUE TO MAINTAIN SWPPP CONTROLS AT ALL STORMDRAIN FACILITIES
-CONTINUE WITH SWEEPING SCHEDULE
05/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval GRASS CLIPPINGS EAST OF WALKING PATH EAST OF PARK
CLEAN CONCRETE WASH-OUT OUT OF CHANNEL #3
05/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval RE-ESTABLISH SEDIMENT CONTROLS @ SCUPPER INLET EAST OF NURSERY ON PAINTED TURTLE
SWEEP TRACK OUT ALONG PAINTED TURTLE
CLEAN UP ALL DIRT/DEBRIS FROM LANDSCAPE WORK BETWEEN CURB AND SIDEWALK
STABILIZE/USE CONTROLS ALONG EAST SIDE OF SITE WHERE LANDSCAPE WORK ON-GOING

LAST HOUSE TO CLOSE ESCROW AROUND THE 16TH OF JUNE
04/24/2006 STORMWATER FOLLOW-UP INSP Partial Approval ISSUES HAVE BEEN ADDRESSED
SITE NEEDS TO BE SWEPT
TURN ABOUT ON COURTLAND TO BE STARTED IN NEXT FEW WEEKS PER BERT WITH PULTE
04/10/2006 STORMWATER FOLLOW-UP INSP Correction Required 3RD NOTICE FROM INSPECTION 3/23
SITE NEEDS TO BE SWEPT
GRAVEL FILTER BAGS MISSING/BROKEN AT:
SWAYING PALMS AND PAINTED TURTLE
SCUPPER INLET ON CAPERCALLIE
SCUPPER INLET ON SWAYING PALMS
04/03/2006 STORMWATER FOLLOW-UP INSP Correction Required ISSUES FROM LAST INSPECTION HAVE NOT BEEN ADDRESSED
03/23/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS TO BE SWEPT
GRAVEL FILTER BAGS MISSING/BROKEN AT:
SWAYING PALMS AND PAINTED TURTLE
SCUPPER INLET ON CAPERCALLIE
SCUPPER INLET ON SWAYING PALMS
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE NEEDS GENERAL SWEEPING OTHERWISE NO CONCERNS
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE WITH BERT 241-9109 PULTE HOMES

STOCKPILE TO BE MOVED 1/30
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION NO CONCERNS AT THIS TIME
12/15/2005 STORMWATER FOLLOW-UP INSP Partial Approval ISSUES FROM 11/16 INSPECTION HAVE BEEN ADDRESSED NO CONCERNS AT THIS TIME

11/16 INSPECTION:
1 CONCRETE WASH OUT AREA IS LOCATED N OF LOT 47
2 SWEEPING SCHEDULE IS SAT AND TUES
OK- 3 SOME EROSION AND LOOSE SILT FENCE AT EAST END OF PAINTED TURTLE
OK- 4 NO SEDIMENT CONTROLS AT RIP RAP OUTLET AT THE NORTH END OF SWAYING PALMS
OK- 5 LANDSCAPERS TRENCHED THROUGH FILTER FABRIC AT EAST END OF COURTLAND-BEFORE RIP RAP IS REPLACED NEEDS FILTER FABRIC REPLACED
OK- 6 SOUTH AND NORTH SIDE OF BASIN AT INLET SCUPPERS GRAVEL FILTER BAGS BROKEN OPEN AND NEED TO BE REPLACED
OK- 7 NO PROTECTION AROUND ANY OF THE CATCH BASINS-SITE SUPER MADE AWARE. PER SUPER THERE ARE FILTERS LOCATED WITHIN CATCH BASINS
11/22/2005 STORMWATER FOLLOW-UP INSP Correction Required SUB HAS WASHED OUT NORTH OF 10442 PAINTED TURTLE

ITEMS 2-6 FROM 11/16 INSPECTION STILL NOT ADDRESSED:

11/16 INSPECTION:
1 CONCRETE WASH OUT AREA IS LOCATED N OF LOT 47
2 SWEEPING SCHEDULE IS SAT AND TUES
3 SOME EROSION AND LOOSE SILT FENCE AT EAST END OF PAINTED TURTLE
4 NO SEDIMENT CONTROLS AT RIP RAP OUTLET AT THE NORTH END OF SWAYING PALMS
5 LANDSCAPERS TRENCHED THROUGH FILTER FABRIC AT EAST END OF COURTLAND-BEFORE RIP RAP IS REPLACED NEEDS FILTER FABRIC REPLACED
6 SOUTH AND NORTH SIDE OF BASIN AT INLET SCUPPERS GRAVEL FILTER BAGS BROKEN OPEN AND NEED TO BE REPLACED
7 NO PROTECTION AROUND ANY OF THE CATCH BASINS-SITE SUPER MADE AWARE.
11/16/2005 STORMWATER FOLLOW-UP INSP Correction Required -CONCRETE WASH OUT AREA IS LOCATED N OF LOT 47
-SWEEPING SCHEDULE IS SAT AND TUES
-SOME EROSION AND LOOSE SILT FENCE AT EAST END OF PAINTED TURTLE
-NO SEDIMENT CONTROLS AT RIP RAP OUTLET AT THE NORTH END OF SWAYING PALMS
-LANDSCAPERS TRENCHED THROUGH FILTER FABRIC AT EAST END OF COURTLAND-BEFORE RIP RAP IS REPLACED NEEDS FILTER FABRIC REPLACED
-SOUTH AND NORTH SIDE OF BASIN AT INLET SCUPPERS GRAVEL FILTER BAGS BROKEN OPEN AND NEED TO BE REPLACED
-NO PROTECTION AROUND ANY OF THE CATCH BASINS-SITE SUPER MADE AWARE.
05/12/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS PROJECT HAS REPAIRED AND ADDRESSED ALL SWPPP CONCERNS PREVIOUSLY NOTED. NO MAJOR STORM WATER CONCERNS REMAIN ON THIS SITE AT THIS TIME. THE BARRIED ASPHALT WAS REMOVED FROM WITH IN THE RETENTION/DETENTION BASIN.
05/04/2005 STORMWATER FOLLOW-UP INSP Correction Required I MET WITH THE SITE SUPERINTENDENT BERT RODRIGUEZ (241-9109) TO ADDRESS SOME CONCERNS ON STORM WATER CONTROL MAINTENANCE. HE ALSO HAD LINDSAY CARNEY WITH WESTLAND RESOURCES TO FOLLOW ALONG. WE DISCUSSED SEVERAL AREAS THAT ARE IN NEED OF CORRECTION AND HE EXPLAINED BY NEXT WEEK HE WOULD HAVE THE STORM WATER CONTROLS ADDRESSED AND COMPLETED.