Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 03/29/2005 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
|
| 01/13/2005 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
RON DECKER IS THE SUPERINTENDENT FOR THIS SITE. CONTACT NUMBER FOR RON IS (888-1881,906-0992). RON HAD CALLED US OUT FOR INSPECTION OF THE STORM WATER CONTROLS AS WELL AS INSPECTION OF INSTALLING STORM WATER PIPING LOCATED IN THE S. END OF THE PROJECT. I DISCUSSED SOME MINOR CORRECTIONS FOR RONS STORM WATER CONTROLS AND EXPLAINED I WOULD RE-INSPECT TUESDAY THE 18TH. THE PIPING FOR STORM WATER RUN-OFF TRANSFERING STORM WATER TO THE DETENTION/RETENTION BASINS WAS SATISFACTORY PER APPROVED PLANS. |