Inspection History Details
Permit: T04BU00947
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2007 | STORMWATER FOLLOW-UP INSP | Approved | SITE STABILIZATION IS COMPLETE. | |
| 07/12/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE SANDBAGS ACROSS DRAINAGE OUTFALL AT SOUTHEAST CORNER OF SITE. 2. SWEEP THE STREET AND REMOVE SEDIMENT FROM AREA IN FRONT OF THE R/D BASIN INLETS. 3. PROVIDE A SIGN AT THE DESIGNATED CONCRETE WASH-OUT AND PROVIDE CONTAINMENT FOR CONCRETE WASH-OUT. 4. PROVIDE SEDIMENT AND EROSION CONTROLS AT THE WEST PERIMETER AND REMOVE SOIL AND CONSTRUCTION MATERIAL FROM ADJACENT LOT TO THE WEST. 5. PROVIDE A COPY OF THE SWPPP ON SITE WITH THE INSPECTION REPORTS. I MET WITH EDMUND RODRIQUEZ, HIS SUP. IS DON 631-0250. THE OWNER IS LEE RAYBURN 977-0151 |
|
| 02/23/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | ||
| 01/19/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONTROLS. ELECTRICAL TRANSFORMERS HAVE BEEN INSTALLED. SITE UTILITIES ARE COMPLETE. |
|
| 12/22/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | SANDBAGS HAVE BEEN PROVIDED AT DRAINAGE INLETS. CONCRETE WASH-OUT WILL BE INSPECTED DURING FOLLOW-UP ONCE HOME CONSTRUCTION IS IN PROGRESS. | |
| 12/13/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE SANDBAGS AT BASIN SCUPPER INLETS, DRAINAGE CHANNEL ACCESS ENTRANCE/SPILLWAY, AND SWALE INLET ANT THE NW CORNER OF THE SITE. 2. PROVIDE DESIGNATED CONCRETE WASHOUT AREA. |
|
| 08/25/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval |