Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T04BU00946
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2006 | GRADING - INTERMEDIATE | Approved | INTERMEDIATE APPROVED DUE TO SEMI-COMPLETION. FINAL GRADING DENIED SEE NOTES |
|
03/15/2006 | GRADING - INTERMEDIATE | Denied | DENIED, NOT READY FOR INSPECTION. SEE COMMENTS LISTED FOR INSPECTIONS COMPLETED ON 12-14-05 AND 12-05-05. COMPLETE ALL ITEMS THEN CALL FOR INSPECTION. |
|
12/14/2005 | GRADING - INTERMEDIATE | Denied | 1. COMPLETE ALL OUTSTANDING ITEMS LISTED ON 12/05/05 INSPECTION REPORT 2. PROVIDE ALL SIGNAGE AT ENTRANCE AND EXIT DRIVEWAYS. BEFORE OPENING AT 5:00PM ON 12/14/05. 3. COMPLETE PLAZA SEATING AREA AT NORTHWEST CORNER OF LOT. 4. PROVIDE THE GATE ON THE PALLET STORAGE AREA EAST OF BLDG. ESTIMATED COMPLETION DATE 12/16/05 5. COMPLETE CONSTRUCTION OF RETENTION/DETENTION BASINS AND PROVIDE FULL 8" DRAINAGE OPENINGS IN THE SITE WALL. ESTIMATED COMPLETION DATE 12/23/05. 6. PROVIDE BICYCLE PARKING AS SHOWN ON THE DEVELOPMENT PLAN. ESTIMATED COMPLETION DATE 12/28/05 7. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS ON UN-BUILT LOTS ADJACENT TO HOME DEPOT. 8. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN/PUBLIC ACCESSS, INCLUDING AREAS OUTSIDE SITE WALL ON NEFFSON AND LIMBERLOST ROAD. 9. PROVIDE SAFE PEDESTRIAN ACCESS TO SIDEWALKS ALONG THE SPINE ROAD. MOVE THE TEMPORARY CONSTRUCTION FENCE ROAD TO THE WEST OF THE SIDEWALK. |
|
12/05/2005 | GRADING - INTERMEDIATE | Denied | 1. SUBMIT REVISED GRADING AND DEVELOPMENT PLANS TO THE CITY OF TUCSON DEVELOPMENT SERVICES ENGINEERING AND ZONING DIVISION FOR REVIEW AND APPROVAL. (SEE GRADING PLAN NOTES 13 AND 24) 2. PROVIDE THE REVISED AND APPROVED PLANS ON SITE FOR CONSTRUCTION AND INSPECTION PURPOSES. APPROVED PLANS MUST BE KEPT ON SITE AT ALL TIMES. (SEE GRADING NOTE 23) 3. PROVIDE A LETTER FROM THE ARIZONA REGISTERED PROFESSIONAL ENGINEER CERTIFIYING THAT THE PROJECT AND THE RETENTION DETENTION BASINS WERE CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS. THIS IS REQUIRED BEFORE REQUESTING CERTIFICATE OF OCCUPANCY. (SEE GRADING NOTE 25) 4. COMPLETE CONSTRUCTION OF THE DRAINAGE SYSTEM INCLUDING: RETENTION/DETENTION BASINS; INLET AND OUTLET STRUCTURES; AND DRAINAGE SWALES. 5. BACK FILL THE WALL FOOTING AND CONSTRUCT THE DRAINAGE SWALE AT THE SOUTHEAST CORNER OF THE SITE. 6. COMPLETE ALL SITE GRADING AND STABILIZATION OF UN-BUILT LOTS. 7. COMPLETE ALL STREET AND SIDEWALK IMPROVEMENTS AT THE PERIMETER OF THE SITE. 8. COMPLETE ALL SIDEWALK AND PEDESTRIAN CIRCULATION WALKWAYS ON THE INTERIOR OF THE PROJECT. 9. CORRECT ALL DEFICIENCIES PREVIOUSLY NOTED FOR ALL BUILDINGS THAT HAVE ALREADY RECEIVED TEMPORARY CERTIFICATES OF OCCUPANCY. |