Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T04BU00946
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/20/2005 | ENGINEERING PRE-CONSTRUCTION | Approved | Met with new super on site Mike Steel. and discussed stormwater problems, he will install straw bales at outfall of CMP pipe after each day of work. Repair wadel along Wetmor due to last rain. I also discussed with him the Walgreen project and that all items for that site as well as Jarred and BJ's must be complete prior to C of O. | |
08/23/2004 | ENGINEERING PRE-CONSTRUCTION | Approved | I MET WITH TRIUMPH CONST. MIKE GILLIS 954-3312 1. PROVIDE A SIGN AT THE CONSTRUCTION ENTRANCE WITH AZPDES AUTHORIZATION #, SITE CONTACT NAMEN AND #, BRIEF DESCRIPTION OF THE PROJECT AND THE LOCATION OF THE SWPPP. 2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 3. ROUGH CUT R/D BASINS AND INSTALL STRAW BALES AT THE OUTFALLS. 4. PROVIDE A CONCRETE WASHOUT AREA. 5. CALL FOR INSPECTION OF THE INSTALLATION OF STORMWATER CONTROLS. |