Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2004 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 09/15/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/17/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED1)50' & 55' BRIDGES NOT IN LOCATION ON PLAN 2)REMOVE RIP RAP SO I KNOW WHERE CAISSEN IS 1010-DENIED-1)PLAN SHOWS 5' LEVEL GROUND @ ABUTMENTS-THIS DOES NOT EXIST AT MOST BRIDGES 1035-DENIED-1)PLAN SHOWS NO MEASUREMENT FOR HOW HIGH PILINGS MAY BE ABOVE TOP OF IAEAITTEN? MOST PILINGS ACTEND UP TO ABOUT MED? 2)MAX HEIGHT TO DECK EXCEEDED ON BRIDGE B&E 1090-NOT READY |
|
| 08/13/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/12/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/12/2004 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) BRIDGE "E" AT FAIRWAY #11: EXCEEDS MAXIMUM DECK HEIGHT INDICATED ON PLAN 2) DOES NOT HAVE THE 5' OF LEVEL EARTH INDICATED ON PLAN AT NORTH EAST PILING 3) NEED TO SPEAK TO ENGINEER AS PLAN ONLY INDICATES DEPTH OF CAISSONS AND PILINGS BELOW GRADE BUT DOES NOT ADDRESS HOW HIGH OUT OF GROUND THEY MAY EXTEND |
|
| 08/10/2004 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 08/02/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 06/23/2004 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :MET WITH CONTRACTOR AND STEVE LONG AT SITE TO DETERMINE HOW MUCH NEEDS TO BE EXPOSED FOR INSP THAT WERE NOT CALLED IN MR VEIL IS AMENDING PLANS FOR WING WALLS AND FURTHER REVIEW WILL BE DONE AFTER I SPEAK TO D. MWEWA AT TERRACON AND SEE APPROVED PLANS |