Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 10/12/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | 9154 - (STORMWATER FOLLOW-UP INSPECTION), I MET WITH BOB NECCINGER AND DISCUSSED SWPPP CONTROLS ON HIS SITE. HE WILL BE PAVING NEXT WEEK ON THE 20TH. NO OTHER STORM WATER CONCERNS AT THIS TIME. |