Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU00781
Inspection Description - GRADING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2005 | GRADING - FINAL | Approved | ALL WORK HAS BEEN COMPLETED ON THIS SITE. CRACKED CURB WAS REPAIRED WITH ACCORDANCE TO C.O.T. DEVELOPMENT STANDARDS. PAVING PATCH REPAIR HAS BEEN COMPLETED AND FINAL GRADING IS APPROVED. SUPERINTENDENT IS ANGEL (954-5048) | |
| 04/05/2005 | GRADING - FINAL | Partial Approval | TEMPORARY C OF O. FINAL PAVING REPAIR WORK IN THE SE CORNER IS NOT COMPLETED AT THIS TIME. WILL RE-INSPECT TOMORROW WEDNESDAY THE 6TH. |
|
| 12/28/2004 | GRADING - FINAL | Denied | SITE IS NOT 100% COMPLETE. ROCK-RIP-RAP FOR DRAINAGE LOCATED IN THE NE CORNER IS BEING INSTALLED BUT NOT COMPLETE. DOWN-SPOUTS FOR BUILDING ARE NOT COMPLETE. FINE GRADING AND DECORATIVE ROCK STILL NEED TO BE COMPLETED. CALLED THE SUPERINTENDENT AND EXPLAINED TO HAVE ALL CONCERNS FINALIZED BEFORE CALLING IN ANOTHER FINAL GRADING INSPECTION. | |
| 12/22/2004 | GRADING - FINAL | Denied | 1. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL, DEBRIS AND EXCESS SOIL ON THE SITE AND IN THE ALLEY EAST OF THE BUILDING. 2. COMPLETE THE NORTH PERIMETER LANDSCAPE STRIP AND THE ROCK RIP-RAP AT THE NE CORNER. 3. PROVIDE DRAINAGE WALL OPENING AT SOUTH PATIO WALL. 4. PROVIDE (1) HANDICAP VAN ACCESS SIGN. |
|
| 05/04/2004 | GRADING - FINAL | Denied | SITE IS NOT READY FOR FINAL GRADING INSPECTION. CALL FOR RE-INSPECTION WHEN ALL SITE WORK IS 99% COMPLETE. SUPER IS SUSAN (256-5699). |