Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU00623
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
08/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. SITE WORK IS ALMOST COMPLETE.; |
|
06/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS SUBGRADE FOR PAVING IS IN PROGRESS. |
|
11/10/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPAIR OR REPLACE SILT FENCING AT PERIMETER OF SITE WHERE NO STABILIZATION HAS BEEN COMPLETED. 2. PROVIDE SWPPP CONTROLS AT THE PERIMETER OF THE UNFINISHED LOTS AT THE EASTERN PORTION OF THE SITE. 3. PROVIDE DUST CONTROL FOR THE EASTERN PORTION TO THIS SITE. 4. SWEEP ALL SEDIMENT AND SOIL FROM THE PUBLIC RIGHT OF WAY AND THE NEW ON-SITE ASPHALT PAVING. 5. UPDATE THE SWPPP TO SHOW CURRENT CONDITIONS. |
|
10/05/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE CONTINUOUS DUST CONTROL - ESTABLISH CRUST ON ALL DISTURBED AREAS. | |
09/27/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE DUST CONTROL ON SITE AT ALL TIMES | |
05/17/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor working on Swan piled dirt in ROW at inlet to storm drain. I had them remove dirt from road and install inlet protection on Swan. |