Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2006 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
|
| 02/07/2005 |
ENGINEERING PRE-CONSTRUCTION |
|
Not ready for Inspection |
I MET WITH THE SUPERINTENDENT WITH SILVER WEST INC. (PUNCH IS THE SUPER'S NAME..PHONE# 405-0950. THIS SITE HAS BEEN REVISED TO CONSTRUCT A CHURCH AND NOT APPARTMENTS. THE SITE HAD SILT-FENCING DESIGNED AROUND THE ENTIRE SITE. THE EXISTING AND FINAL GRADE OF THE SITE IS SLOPED FROM THE S. TO THE NW. THE SILT-FENCING WAS AGREED TO BE ELIMINATED ON THE S PARIMETER AND PARTIAL E AND PARTIAL W PARIMETERS. ALL OTHE BMP'S HAVE BEEN DISCUSSED AND A RE-INSPECTION IS SCHEDULED FOR FRIDAY THE 11TH. |