Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2005 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
I MET WITH DAVID THE SUPERINTENDENT FOR THIS PROJECT REGARDING THE CONSTRUCTION OF THE DRAINAGE SWELL LEADING ON-SITE DRAINAGE INTO AN EXISTING CHANNEL ON THE N. SIDE OF THE PROJECT. I EXPLAINED THE NEED TO HAVE SOME OF THE LOOSE DIRT PULLED BACK FROM FALLING INTO THE CHANNEL. HE EXPLAINED HE UNDERSTOOD THE CORRECTION NEEDED AND THAT I WOULD BE BACK TO INSPECT THE WORK WITHIN THE NEXT WEEK WHEN THE WORK IS TO OCCUR. |
| 03/22/2005 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
I spoke with the superintendent David regarding some of the drainage improvements for the A-Atlas Storage. The onsite drainage will exit the N. end of the project and into an existing dirt drainage channel. I will be meeting with him onsite on 3/24/05 to discuss concerns with the construction and final product of the drainage swell leading to the drainage channel. |
| 12/21/2004 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
INSPECTED SITE FOR GRADING AND EROSION, SPOKE TO FORMAN ABOUT FINAL GRADING CONCERNS |
| 06/25/2004 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Site is in good condition with no storm water concerns at this time. |
| 06/07/2004 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Site is stable and has no other storm water concerns at this time. |