Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 02/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 01/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 01/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CALL FOR STORMWATER PRE-CON INSPECTION. 2. CALL FOR STORMWATER INSTALLATION OF SWPPP CONTROLS. 3. POST AZPDES AUTHORIZATION 4. KEY IN AND STAKE STRAWBALES IN THE DRAINAGE CHANNEL PER SWPPP AT (5) LOCATIONS. 5. PROVIDE INLET SWPPP CONTROLS AT THE STORMDRAIN PIPE AT NORTHEAST END OF PROJECT. |