Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU00230
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
02/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
01/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
01/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CALL FOR STORMWATER PRE-CON INSPECTION. 2. CALL FOR STORMWATER INSTALLATION OF SWPPP CONTROLS. 3. POST AZPDES AUTHORIZATION 4. KEY IN AND STAKE STRAWBALES IN THE DRAINAGE CHANNEL PER SWPPP AT (5) LOCATIONS. 5. PROVIDE INLET SWPPP CONTROLS AT THE STORMDRAIN PIPE AT NORTHEAST END OF PROJECT. |