Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T04BU00186
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2005 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
08/04/2004 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1. PROVIDE A STRAWBALE OUTFALL AT THE NORTHWEST CORNER OF THE SITE, SILT FENCING AT THE SOUTH PERIMETER, AND A STABILIZED CONSTRUCTION ENTRANCE. 2. POST THE AZPDES AUTHORIZATION NUMBER, THE NAME AND TELEPHONE NUMBER OF THE SITE CONTACT PERSON, A BRIEF DESCRIPTION OF THE PROJECT, AND THE LOCATION OF THE SWPPP (SEE PAGE 19 OF THE AZPDES GENERAL PERMIT). 3. POST THE CITY OF TUCSON GRADING PERMIT CARD. 4. CALL FOR INSPECTION OF STORMWATER CONTROLS AS SOON AS CONTROLS ARE IN PLACE AND BEFORE THE NEXT RAIN EVENT OCCURS. 2. |
|
07/09/2004 | ENGINEERING PRE-CONSTRUCTION | Correction Required | DEMOLITION AT THIS SITE HAS DISTURBED MORE THAN 1 ACRE. MR. KARON WAS NOTIFIED THAT STORMWATER CONTROLS ARE REQUIRED FOR DISTURBED AREAS GREATER THAN 1 ACRE. |