Inspection Status: Approved
Inspection History: POOL/SPA PLUMBING
| Date |
Description |
Inspector |
Results |
Comments |
| 02/23/2004 |
POOL/SPA PLUMBING |
|
Approved |
IVRS - Inspection 0000* |
| 02/20/2004 |
POOL/SPA PLUMBING |
|
Denied |
IVRS - Inspection 0999*/ 1) SEDIMENT TRAP REQUIRED AT GAS OINE FOR HEATER 2) PROVIDE TEST ON GAS LINE WITH HEATER DISCONNECTED PER MANUFACTURERS SPECS 3) BOND WIRE TO J-BOX |
| 01/30/2004 |
POOL/SPA PLUMBING |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) IS S.W. GAS GOING TO INSTALL A METER AT SECONDARY BLDG AT GAS RISER ? IF SO OK, IF MORE GAS LINE IS GOING TO BE RUN, CALL FOR INSPECTION DON'T COVER 2) WATER LEAK AT POOL HEATER 3) ALL CONDUIT IN PLACE WIRIGN NOT COMPLETED 4) FROM POOL HEATER TO SECONDARY BLDG APPROX. 20' OF PIPE UNDER GRD. |