Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU00159
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2005 | STORMWATER FOLLOW-UP INSP | Approved | Contractor completed all work. | |
| 12/14/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor completed grading, to call in finial grading inspection and C of O on Monday 12/19/05. | |
| 12/01/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor given copy of Stormwater Ordinance. Wayne Aderson new super on site. Cell 488-6278. |
|
| 11/10/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor going to install check dam in basin area. Sub dumped spoil pile in basin. | |
| 10/27/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor wants to watch spoil pile on southside of property for run off. | |
| 10/13/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. Contractor has graded around detention basin area. | |
| 09/28/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
| 09/13/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed sewll around southside of property to stop run off and tied swell into detention basin. Spoke to super in regards to basin walls. If walls are 4 to 1 or steeper and more then a 2 feet in depth a barrier of some type is needed. |
|
| 09/01/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to watch for: 1- Track-out and silt on streets. 2- Keep positive flow onto property along south edge. Waddle or silt fence may need to be installed. |
|
| 08/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor using detention basin as concrete wash out area. Contractor needs to maintain positive flow on southside of property. If positive flow is lost contractor will need to install stormwater controls to stop run off. | |
| 08/02/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Talked to BJ site super about keeping track out cleaned up. |