Inspection History Details
Permit: T04BU00122
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2019 | GRADING - FINAL | Approved | ||
| 03/21/2011 | GRADING - FINAL | Continued | NO ACTIVITY ON SITE AT THIS TIME. | |
| 01/30/2009 | GRADING - FINAL | Partial Approval | Met on site with new site super, went over punch list. Punch list is only a prelininary list. Contractor will need to address items then call for re-inspection. | |
| 01/29/2009 | GRADING - FINAL | Denied | This is a preliminary punch list, not the final. 1- Provide site certification from engineer, per C.O.T. D.M. Chapter XIV, Section 14.2(7). Regards to drainage and detention/retention basins. 2- Remove stockpile or obtain stockpile permit. 3- Stabilize all areas disturbed by construction. 4- Address basin holding water longer then 24 hours. 5- Complete all work in basin, per the approved drawing. 6- Repair security barrier around basin. 7- Install catch basin at Missiondale and Duoba. Per the approved plan. 8- Address erosion north side of lot 19. 9- Replace broken curb at basin inlet. 10- Re-install all SWPPP controls. (3) 11- Remove all debris from alley and south side of project. 12- Grade all lots to drain per the approved drawings. 13- Repair fence south side of basin. (iron) 14- Address setbacks for all lots. 15- Complete all sidewalks per the approved drawings. 16- Install all "No Parking" signs. 17- Install safety railing back of scupper. Contractor needs to complete items and call in for re-inspection. This is just a preliminary punch list not the final. |
|
| 01/12/2009 | GRADING - FINAL | Correction Required | Contractor needs to stabilize all lots and obtain stockpiling permit. | |
| 04/14/2008 | GRADING - FINAL | Correction Required | Contractor needs to repair block wall on southwest corner of basin. | |
| 10/16/2007 | GRADING - FINAL | Partial Approval | Contractor graded intersection to drain. Contractor still needs to install catch basin east side of slot drain. Spoke to Scott in regards to. | |
| 02/23/2007 | GRADING - FINAL | Partial Approval | OK to place concrete for sidewalk and driveway aprons. Contractor provided passing compaction test. | |
| 02/21/2007 | GRADING - FINAL | Partial Approval | Bill (project manager) called asked if I would stop by and inspect driveway aprons for lots 25 and 26. Lots not ready when I got there. Contractor to re-schedule at later time. | |
| 09/21/2006 | GRADING - FINAL | Partial Approval | 9/20 Contractor installed rebar in scupper. 9/21 Contractor installed wire mesh in access ramp. |
|
| 08/02/2006 | GRADING - FINAL | Correction Required | Contractor needs to address: 1- Address basin holding water. 2- Address sink hole aroundmanhole lid. |
|
| 06/20/2006 | GRADING - FINAL | Partial Approval | Contractor extending access ramp. Contractor still need to submit reviesed drawing of detention basin. | |
| 06/08/2006 | GRADING - FINAL | Partial Approval | Met Bill watkins and concrete sub on site to discuss scupper installation. | |
| 05/24/2006 | GRADING - FINAL | Correction Required | Contractor install sidewalks wrong width (4'). Approved drawing call out 5' sidewalks. Contractor to remove and replace with approved width. | |
| 05/18/2006 | GRADING - FINAL | Partial Approval | Contractor supplied compaction test report for area over stormsewer. Test 1 96% Test 2 101% |
|
| 05/04/2006 | GRADING - FINAL | Partial Approval | Contractor install approx. 180 feet of stormwater pipe. Per COT standard. Sta. El. 0+00 25.92 0+60 26.30 1+65 27.00 Stations are approx. Station 0+00 just before 45 into basin. |