Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Closed
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/10/2004 |
FOLLOW UP CODE VIOLATION |
|
Closed |
PLANS ARE BEING REDRAWN. UNITS TO BE DEMOLISHED & NEW STRUCTURES WILL BE BUILT. CLOSE CASE PER INSPECTOR. |
| 02/11/2004 |
FOLLOW UP CODE VIOLATION |
|
Violation |
30 DAY EXTENSION GRANTED PER STEVE LONG. |
| 01/12/2004 |
FOLLOW UP CODE VIOLATION |
|
Violation |
PLANS IN REVIEW SCHEDULED TO BE OUT ON 2/9/04. FU FOR 2/10/04. |
| 01/08/2004 |
FOLLOW UP CODE VIOLATION |
|
Violation |
ALL REVIEWS COMPLETED. PLANS TO BE SUBMITTED BY 1/12/04. FU FOR 1/12/04 |
| 12/23/2003 |
FOLLOW UP CODE VIOLATION |
|
Violation |
14 DAY WAITING PERIOD FOR LDO CHECK W/ FRANK PODGORSKI AFTER JAN 7TH. FU FOR JAN 7TH. |
| 12/02/2003 |
FOLLOW UP CODE VIOLATION |
|
Violation |
|
| 12/02/2003 |
FOLLOW UP CODE VIOLATION |
|
Violation |
LEFT MESSAGE FOR CONTRACTOR TO CALL INSPECTOR 11/28/03. RECEIVED MESSAGE FROM JIM WEATHERFORD PLANS ARE STILL GOING THROUGH PC HICTORIC REVIEW. F U DEC 22 |
| 09/26/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
QWNER IS WAITING FOR L.D.O. FU 60 DAYS |
| 08/26/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PERMIT T03CM04010 APPLIED FOR 08/13/03 BY JIM WEATHERFORD (219-9614). ACCORDING TO MR WEATHERFORD, PLANS MUST GO THRU HISTORIC REVIEW. |
| 07/14/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PLANS ARE BEING PREPARED, F/U 08/14/03 |
| 06/26/2003 |
FOLLOW UP CODE VIOLATION |
|
Violation |
NOV ISSUED TO MICHAEL FIGUEROA TR FOR CONVERTING THREE SHEDS ON THE SOUTH SIDE OF THE REAR YARD INTO OFFICES, POSSIBLY RENTALS. F/U 07/14/03 |