Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/09/2003 |
INITIAL CODE VIOLATION |
|
Correction Required |
EMERGENCY CALL-OUT DUE TO FIRE, FIRE ALARM #18173, COMMANDER: CAPT. RODRIGUEZ ENGINE 2, OWNER NOTIFIED AND GIVEN N&O, UTILITIES DISCONNECTED (GAS/ELECTRIC), INSPECTED ATTIC THRU ROOF FOUND QUITE A BIT OF FIRE DAMAGE ON TRUSSES AND ROOF FRAMING, APPROX 5-7 CIRCUITS DAMAGE BY FIRE, DUCT WORK-SOME FLEXIBLE AND INSULATION BURNED, OWNER WILL NEED AN ARCHITECT TO ACCESS STRUCTURAL DAMAGE AND OBTAIN PERMITS FOR ELECTRIC, PLUMBING, MECHANICAL AND STRUCTURAL, CAUSE OF DAMAGE: FIRE IN ATTIC-POSSIBLE ELECTRIC PROBLEM, LOCATION OF DAMAGE: APPROX AREA IN ATTIC EAST KITCHEN ENTRY, BLDG: FRAMING AND TRUSS FIRE DAMAGE IN ATTIC FIRE DAMAGED CEILING IN ATTIC AREA CUT OPENINGS KITCHEN CEILING AND GARAGE AND VARIOUS ROOM, ELECT: BURNED WIRING IN ATTIC AREA SEVERAL J-BOXES FIRE DAMAGED, SEVERAL CIRCUITS BURNED IN HALF INSIDE PANEL HEAVILY WATER DAMAGED ALL CB'S TO BE CHANGED OUT, SERVICE DISCONNECT HAS MULTIPLE WIGGING-TO BE CORRECTED PRIOR TO ENERGIZE OBATAIN A C-11 LICENSED CONTRACTOR TO MAKE ALL CORRECTIONS THUR PERMIT AND INSPECTIONS, PLUMBING: MUST BE INVESTIGATED, MECH: BURNED DUCT WORK IN ATTIC AND REST TO BE INVESTIGATED, SUMMARY: OWNER SHALL OBTAIN PERMITS OF CORRECTION/C-11 ELECTRICIAN TO MAKE ALL WIRING CHANGES RING ALL WIRING TO REMAIN-PROVIDE LETTER OF APPROVAL TO INSPECTION DEPT PRIOR TO ENERGIZE, |