Case: T03VL00208

Parcel: 111072090


Addresses:

3154 E ALMARTIN ST

Inspection Status: Compliance

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
02/09/2004 FOLLOW UP CODE VIOLATION Compliance PERMIT OBTAINED T03CM01141 ISSUED 1/22/04. CLOSE CASE PER INSPECTOR.
12/15/2003 FOLLOW UP CODE VIOLATION Violation PLANS STILL IN PLAN CHECK F U 30 DAYS
12/05/2003 FOLLOW UP CODE VIOLATION Violation PLANS WERE PICKED UP FOR MODIFICATIONS. F U 12/15/03
11/18/2003 FOLLOW UP CODE VIOLATION Violation PLANS HAVE NOT BEEN COMPLETED BY THE RESIDENTIAL REVIEWER. SHOULD BE COMPLETED BY 26TH OF NOVEMBER. DO FU FOR 28TH OF NOVEMBER.
09/30/2003 FOLLOW UP CODE VIOLATION Violation PLANS ARE IN THE COMPLETION STAGE. DO F.U. FOR 15 OCT. 03.
07/07/2003 FOLLOW UP CODE VIOLATION Correction Required ELECTRICIAN COMPLETING HIS PLANS AND CALCULATIONS. F/U 07/22/03
05/21/2003 FOLLOW UP CODE VIOLATION Correction Required WAITING FOR ARCHITECT TO COMPLETE PLANS.
05/01/2003 FOLLOW UP CODE VIOLATION Correction Required PLANS SHOULD BE FINALIZED BY 05/10/03, F/U 05/14/03
04/16/2003 FOLLOW UP CODE VIOLATION Correction Required INSPECTOR LEFT MSG FOR PETE WEBER TO CONTACT INSPECTOR. INSPECTOR RECEIVED PHONE CALL WITH STATUS THAT OWNER WILL BE GETTING PLANS IN NEXT WEEK, HAS THEM COMPLETED AND FOUND PREVIOUS PLOT PLAN THAT HAS BEEN APPROVED. F/U 05/01/03
03/20/2003 FOLLOW UP CODE VIOLATION Violation NOV ISSUED TO ELAINE WEBER & GERARD & THELMA ROY FOR CONVERSION OF A 20'X21'4" GARAGE INTO A LIVING UNIT (RENTAL) WOP OR INSPECTIONS. POSSIBLY INCLUDING ELECTRICAL, PLUMBING AND HVAC. F/U 04/16/03