Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/22/2003 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
PERMIT T03CM01519 ISSUED 04/15/03 |
| 04/14/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
INSPECTOR SPOKE WITH OWNER AND ASKED THAT CONTRACTOR CALL TO GET CASE MOVING AGAIN. VARIANCE PROCESS HAS NOT BEEN STARTED. F/U 04/23/03 |
| 04/01/2003 |
FOLLOW UP CODE VIOLATION |
|
Violation |
SPOKE WITH OWNER THIS P.M. CONTRACTOR TOLD HER SHE NEEDED A VARIANCE. SHE WILL COME DOWN AND START THE PROCESS. F/U 04/14/03 |
| 01/30/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
CONSTRUCTION OF A CARPORT ON E/SIDE OF UNIT. ADDITION ON REAR OF UNIT. INCLUDES PLUMBING ROUGH SOIL. FLOOR POURED, ELECTRICAL AND INSULATION BEING INSTALLED. STOP WORK ORDER AND NOV ISSUED. F/U 03/13/03 |
| 01/30/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
AT APPROX 10:40 A.M. I POSTED A COPY OF THE STOP WORK ORDER AND A COPY OF THE NOTICE OF VIOLATION ON THE FRONT WINDOW OF THE DWELLING. PICTURES WERE TAKEN OF THESE. |