Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2003 | INITIAL CODE VIOLATION | Correction Required | OBTAIN PERMITS FOR REMODEL ASAP FOLLOW UP 30 DAY. FOLLOW UP 5/30/03 |